首页> 外文会议>North American Tunneling Conference >Jacked Pre-Cast Caisson Shaft Construction Methodologies
【24h】

Jacked Pre-Cast Caisson Shaft Construction Methodologies

机译:千斤顶预铸造轴轴施工方法

获取原文

摘要

New market adoption of jacked pre-cast caisson shaft construction methodologies. An overview of the jacked caisson methodology and its' application to varying ground conditions; the ability to deliver water-tight, rationalised structures through soft rock, non-cohesive and cohesive ground. Paired with underpinned, under-reamed and corbeled segments, sprayed concrete linings and concreting under-water, this is a safe, versatile, quick construction methodology that can be designed for near surface infrastructure up to 70 m deep. Pre-cast caisson methodology can also minimise the need for wet process applications on site and assist in reducing site waste streams due to its' predominantly pre-cast system components.
机译:新市场采用千斤顶预铸造沉箱轴建筑方法。 千斤顶沉箱方法的概述及其在不同地面条件下的应用; 通过软岩,非粘性和凝聚力递送防水性,合理化结构的能力。 搭配底层,膨胀的底部,喷涂混凝土衬里和水混凝土,这是一种安全,多功能,快速的施工方法,可以设计为近70米深的表面基础设施。 预铸造的沉箱方法可能还可以最大限度地减少现场湿法过程应用的需求,并有助于减少由于其主要预铸造系统组件而减少现场废物流。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号