首页> 外国专利> FOUNDATION STRUCTURE OF FILL, AND CONSTRUCTION METHOD FOR FOUNDATION

FOUNDATION STRUCTURE OF FILL, AND CONSTRUCTION METHOD FOR FOUNDATION

机译:填土的基础结构及基础的施工方法

摘要

PROBLEM TO BE SOLVED: To provide a foundation structure of fill, which enables safe construction without regulating the travel of a train and a vehicle, and a construction method for the foundation structure.;SOLUTION: The foundation structure 1, which is constructed on the fill 3 formed on original ground 2, comprises: a rod-like reinforcing material 4 which is embedded in the fill 3 in such a manner that an upper end is protruded from a slope; a solidified body 5 which is provided on the outer periphery of the reinforcing material 4, so as to fix the reinforcing material 4 to the fill 3; and a supporting portion 6 which is composed of vertical and horizontal beams 6a and 6b arranged in a grid pattern, and which is installed on the slope in the state of being connected to an upper end of the reinforcing material 4. On the horizontal beam 6b on the upper side of the supporting portion 6, a soundproof wall 9 for reducing a traveling sound of the train 8 traveling on a railroad track 7 is mounted along the railroad track 7.;COPYRIGHT: (C)2008,JPO&INPIT
机译:解决的问题:提供一种填充基础结构,其能够在不调节火车和车辆的行进的情况下进行安全施工,以及该基础结构的构建方法。形成在原始地面2上的填充物3包括:杆状增强材料4,其以使得上端从斜坡突出的方式嵌入在填充物3中。固化体5,其设置在增强材料4的外周上,以将增强材料4固定至填充物3。支撑部6由以格子状配置的纵梁6a和横梁6b构成,并在与加强材料4的上端连接的状态下被安装在斜坡上。在支撑部分6的上侧,沿着铁路轨道7安装了用于减少在铁路轨道7上行驶的火车8的行进声音的隔音壁9;版权所有:(C)2008,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号