The system and process for the job schedule which minimizes construction cost

机译:进度计划的系统和过程,可最大程度地降低建设成本

摘要

Increased efficiency and lower cost job scheduling is provided by a system and method that optimizes for cost instead of makespan, and minimizes fluctuations in response utilization. A schedule is constructed using a workflow scheduling system that includes a load leveler (202), a cost minimizer (104), and a manpower planner (106). The load leveler minimizes makespan, subject to resource limits, and then lowers the resource limits, repeating the process in order to create a flatter schedule.
机译:一种系统和方法提供了更高的效率和更低的成本,从而可以针对成本进行优化,而不是对工期进行调整,并最大限度地减少响应利用率的波动。使用工作流调度系统构建调度表,该系统包括负载均衡器(202),成本最小化器(104)和人力计划器(106)。负载均衡器会根据资源限制最大程度地缩短制造时间,然后降低资源限制,重复此过程以创建更平坦的计划。