The manner null which forms invert in the batholith of the existing mountain tunnel

机译:在现有山区隧道的岩底中形成倒置的零位方式

摘要

PROBLEM TO BE SOLVED: To shorten a time required for forming an invert in the base ground of an existing mountain tunnel. SOLUTION: In order to form an invert 18 in the base ground 14 of an existing mountain tunnel 10, the following processes are applied sequentially to each of one half part 26 and the other half part 32 in the direction of the width of the base ground. By cutting the base ground, the base 34 of the side wall of lining is exposed and a space for forming the invert which extends in the transverse direction of the tunnel is formed. During the cutting of the base ground, subsequently, a plurality of support means 38 for supporting the side wall are disposed, spaced from each other, under the exposed base of the side wall, Lastly, concrete is placed in the space 18 for forming the invert.
机译:解决的问题:缩短在现有山地隧道基础上形成倒立所需的时间。解决方案:为了在现有的山地隧道10的基础地面14中形成一个倒置面18,在基础地面的宽度方向上依次对一半部分26和另一半部分32分别进行以下过程。通过切割基础地面,衬里侧壁的基础34被暴露,并且形成用于形成在隧道的横向方向上延伸的倒置部的空间。在切割基础地面期间,随后,在侧壁的暴露的基底下方彼此间隔地设置多个用于支撑侧壁的支撑装置38。最后,在空间18中放置混凝土以形成壁。倒置。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号