首页> 外国专利> Construction methods and construction equipment of wind power generation equipment

Construction methods and construction equipment of wind power generation equipment

机译:风力发电设备的施工方法及施工设备

摘要

PROBLEM TO BE SOLVED: To dispense with a large crane for setting a wind power generating device and to carry out the work quickly, safely and securely.;SOLUTION: A tower 4 is constructed by connecting a plurality of segmentation towers upward one by one. A mast 5 comprising a plurality of steps of mast nearly in a U shape in plan view is arranged so as to surround the tower 4 and capable of telescopically rising/descending. The lower end part of the tower 4 and the lower part of the mast 5 are supported by a jacket type foundation structure 2. While stably supported by the established part of the tower 4, the mast 5 is successively raised. A lifting mechanism 15 installed on the upper part of the mast 5 lifts the segmentation towers for completing the tower 4. A generator 6 and a rotor blade 8 are lifted and installed on the upper part of the tower 4. After that, the mast 5 is lowered/contracted to be removed/dismantled from the jacket type foundation structure 2.;COPYRIGHT: (C)2005,JPO&NCIPI
机译:解决的问题:放弃用于设置风力发电装置的大型起重机,并快速,安全和可靠地进行工作。解决方案:塔4是通过将多个分段塔一个接一个地连接而构造的。布置有包括在俯视图中大致呈U形的多个台阶的桅杆5,以围绕塔架4并且能够伸缩地上升/下降。塔架4的下端部分和桅杆5的下部由外套式基础结构2支撑。在由塔架4的既定部分稳定支撑的同时,桅杆5连续地升高。安装在桅杆5的上部的提升机构15提升分段塔以完成塔架4。发电机6和转子叶片8被提升并安装在塔架4的上部。此后,桅杆5降低/收缩以从外套式基础结构2中移除/扭曲。;版权所有:(C)2005,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号