首页> 外国专利> Use of schedule editors in a network-based project schedule management system

Use of schedule editors in a network-based project schedule management system

机译:在基于网络的项目进度管理系统中使用进度编辑器

摘要

A system is used for the creation, maintenance, and management of an overall project schedule, of individual project member schedules, and of project task assignments over a network. The system comprises three editors accessed through a web browser to perform the various tasks by members of a project. Information is passed between a web server and web browser and a database is used to maintain all information. The project manager can use a task assignment editor to assign tasks to individual project members. The project manager can use a project schedule editor to initially create the project schedule and to show the overall project schedule. After the project schedule is created, each project member can create their own member schedule using a member schedule editor, containing tasks related to the project schedule. After project members complete a task, the project member updates the member's schedule via the member schedule editor.
机译:系统用于通过网络创建,维护和管理总体项目进度表,单个项目成员进度表以及项目任务分配。该系统包括三个编辑器,这些编辑器可通过Web浏览器访问,以由项目成员执行各种任务。信息在Web服务器和Web浏览器之间传递,并且数据库用于维护所有信息。项目经理可以使用任务分配编辑器将任务分配给各个项目成员。项目经理可以使用项目进度表编辑器来初始创建项目进度表并显示总体项目进度表。创建项目进度表后,每个项目成员都可以使用成员进度表编辑器创建自己的成员进度表,其中包含与项目进度表相关的任务。项目成员完成任务后,项目成员通过成员时间表编辑器更新成员的时间表。

著录项

  • 公开/公告号US2007288288A1

    专利类型

  • 公开/公告日2007-12-13

    原文格式PDF

  • 申请/专利权人 TETSURO MOTOYAMA;AVERY FONG;

    申请/专利号US20060449116

  • 发明设计人 TETSURO MOTOYAMA;AVERY FONG;

    申请日2006-06-07

  • 分类号G06F15/02;

  • 国家 US

  • 入库时间 2022-08-21 20:15:22

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号