首页> 外国专利> WELL PLANNING USING MONTE CARLO SIMULATION SOFTWARE BASED ON TIME AND COST DATA.

WELL PLANNING USING MONTE CARLO SIMULATION SOFTWARE BASED ON TIME AND COST DATA.

机译:使用基于时间和成本数据的MONTE CARLO模拟软件进行良好的计划。

摘要

A method of generating and displaying time and cost data representing the time and the cost to complete a plurality of oilfield related activities in response to a set of engineering results including wellbore geometry and drilling parameters comprises the steps of: (a) assembling a plurality of time data and a plurality of cost data based on the engineering results in response to a plurality of activity templates; and (b) generating a display of the time data and the cost data, the display illustrating the time data and the cost data representing the time and the cost to complete the plurality of oilfield related activities. The display includes a numerical display and a graphical display.
机译:一种响应于包括井眼几何形状和钻井参数的一组工程结果而生成和显示表示完成多个油田相关活动的时间和成本的时间和成本数据的方法,该方法包括以下步骤:(a)组装多个响应于多个活动模板,基于工程结果的时间数据和多个成本数据; (b)产生时间数据和成本数据的显示,该显示说明时间数据和成本数据,表示完成多个油田相关活动的时间和成本。该显示包括数字显示和图形显示。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号