1.the system u043fu0440u043eu0435u043au0442u0438u0440u043eu0432u0430u043du0438u00a0 predominantly residential village type u0432u043au043bu044eu0447u0430u044eu0449u0430u00a0 overall planning subsystem in the borders of the land; u043fu043eu0434u0441u0438u0441 the theme u043fu0440u043eu0435u043au0442u0438u0440u043eu0432u0430u043du0438u00a0 engineering communications planned village; preparation of pre project document processing subsystem subsystem; data source; p u043eu0434u0441u0438u0441u0442u0435u043cu0443 interactive visualization of the outcome of the work.with the overall planning u0443u043au0430u0437u0430u043du043du0430u00a0 subsystem is designed u0434u043bu00a0 processing at least geometrical parameters u0441u043eu0441u0442u0430u0432u043bu00a0u044eu0449u0438u0445 objects that require place on a square, with u0443u043au0430u0437u0430u043du043du0430u00a0 u043fu0440u043eu0435u043au0442u0438u0440u043eu0432u0430u043du0438u00a0 engineering communications subsystem is designed u0434u043bu00a0 processing at least parameters of straw u0435u043du0438u0439, parameters of terrainwith the u0443u043au0430u0437u0430u043du043du0430u00a0 interactive processing subsystem input provides u0434u043bu00a0 u0432u044bu043fu043eu043bu043du0435u043du0438u00a0 recalculation changes in source data, and u0443u043au0430u0437u0430u043du043du0430u00a0 p u043eu0434u0441u0438u0441u0442u0435u043cu0430 visualization is designed u0434u043bu00a0 u043fu043eu0432u044bu0448u0435u043du0438u00a0 u043du0430u0433u043bu00a0u0434u043du043eu0441u0442u0438 calculation and work with objects in real time, and the subsystem's visualization u0435u043du0435u043du043e means u0431u0435u0441u0441u0442u0443u043fu0435u043du0447u0430u0442u043eu0433u043e u0438u0437u043cu0435u043du0435u043du0438u00a0 detail objects.;2. system u043eu0442u043bu0438u0447u0430u044eu0449u0430u00a0u0441u00a0 1, so that the overall planning as the source data using the size and configuration of the station with the u043fu0440u0438u0432u00a0u0437u043au043eu0439 to object m in the area, the number u043au0430u0442u0435u0433u043eu0440u0438u00a0u043cu0438 and u043fu043bu043eu0449u0430u0434u00a0u043cu0438 individual sites, the availability of natural objects in the territory, the number and size of buildings, u0442u0440u0435u0431u043eu0432u0430u043du0438u00a0 n u043eu0440u043cu0430u0442u0438u0432u043du043e technical documentation.;3. system u043eu0442u043bu0438u0447u0430u044eu0449u0430u00a0u0441u00a0 1, so that the u043fu0440u043eu0435u043au0442u0438u0440u043eu0432u0430u043du0438u00a0 engineering communications, as initial data, using at least the work with u0438u0441u0442u0435u043cu044b overall planning, u0442u0440u0435u0431u043eu0432u0430u043du0438u00a0 regulatory and technical documentation.;4. system u043eu0442u043bu0438u0447u0430u044eu0449u0430u00a0u0441u00a0 1, so that the interactive processing of input data using at least the results of the subsystems of the overall planning and the planning of engineering communications.;5. system u043eu0442u043bu0438u0447u0430u044eu0449u0430u00a0u0441u00a0 1, so that the visualization of the baseline data using the results of all other subsystems, as well as data on the u043du0435u0448u043du0435u043cu0443 translate objects present in the calculations.;6. system u043eu0442u043bu0438u0447u0430u044eu0449u0430u00a0u0441u00a0 clause 5, so that the external u0432u043eu043fu043bu043eu0449u0435u043du0438u00a0 description of objects u0443u0440u043eu0432u043du00a0 house and above is composed of descriptions of simple elements.;7. system u043eu0442u043bu0438u0447u0430u044eu0449u0430u00a0u0441u00a0 clause 5, so that the external u0432u043eu043fu043bu043eu0449u0435u043du0438u00a0 description of objects u0443u0440u043eu0432u043du00a0 house and above is drawn up in two or more versions of u0434u0435u0442u0430u043bu0438u0437u0430u0446 ai.;8. the system for any of the u043fu043f.1 u043eu0442u043bu0438u0447u0430u044eu0449u0430u00a0u0441u00a0 7, so that all the data of regulatory and technical documentation are available in u043fu0440u0438u0441u043eu0435u0434u0438u043du0435u043du043du0443u044e database.;9.method u0431u0435u0441u0441u0442u0443u043fu0435u043du0447u0430u0442u043eu0433u043e u0438u0437u043cu0435u043du0435u043du0438u00a0 detail objects visualization subsystem, using one or more intermediate reference u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0 and means wa recalculation of u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, u0432u044bu043fu043eu043bu043du00a0u044eu0442 following preliminary u0434u0435u0439u0441u0442u0432u0438u00a0: breaking the interval size u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0 on u0440u00a0u0434 on u0434u0438u043du0442u0435u0440u0432u0430u043bu043eu0432 equal or less than the interval.a recalculation of elements covered by u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0; u0434u043bu00a0 borders u043fu043eu0434u0438u043du0442u0435u0440u0432u0430u043bu043eu0432 create their corresponding reference u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0; inserting a recalculation for one or more active element, u0438u043du0434u0438u0446u0438u0440u0443u044eu0449u0438u0439 approaching the edge interval served by means of recalculation.in the process of u0438u0437u043cu0435u043du0435u043du0438u00a0 detail objects u0432u044bu043fu043eu043bu043du00a0u044eu0442 following u0434u0435u0439u0441u0442u0432u0438u00a0: when approaching the edge interval of a received signal and maintained close and from the active elements in the image upload u043eu043fu043eu0440u043du043eu0435 served by interval; in the transition to the next interval and displacement of the point on the u0431u0441u043bu0443u0436u0438u0432u0430u043du0438u00a0 active elementu043eu043fu043eu0440u043du043eu0435 image previous interval unload.;10. a u0431u0435u0441u0441u0442u0443u043fu0435u043du0447u0430u0442u043eu0433u043e u0443u0432u0435u043bu0438u0447u0435u043du0438u00a0 detail objects in imaging subsystem for p.1, using one or more intermediate reference u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0 and means of recalculation of u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 because the interval size s u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0 preliminary consists of u0440u00a0u0434u0430 u043fu043eu0434u0438u043du0442u0435u0440u0432u0430u043bu043eu0432, equal to or less than the interval.a recalculation of elements covered by u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0; u0434u043bu00a0 borders u043fu043eu0434u0438u043du0442u0435u0440u0432u0430u043bu043eu0432 pre u0438u043cu0435u044eu0442u0441u00a0 corresponding reference u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0; tool pen u0435u0440u0430u0441u0447u0435u0442u0430 contains one or more active element, u0438u043du0434u0438u0446u0438u0440u0443u044eu0449u0438u0439 approaching the edge interval served by means of recalculation.;11. method u043du0430u043bu043eu0436u0435u043du0438u00a0 u0442u0435u043au0441u0442u0443u0440u043du044bu0445 coordinates on the u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0 details geometry at home, u043fu043eu0437u0432u043eu043bu00a0u044eu0449u0438u0439 replacement texture model to any other with detail drawing, gce u0442u0432u0435u0442u0441u0442u0432u0443u044eu0449u0438u0435 u0438u0437u043cu0435u0440u0435u043du0438u00a0u043c object in reality, including the creation of invisible reference object u0434u043bu00a0 u0442u0435u043au0441u0442u0443u0440u043du044bu0445 coordinates in the form of a cube with a multiple step pattern, edi nice length model.;12.method u043fu043eu0441u0442u0440u043eu0435u043du0438u00a0 terrain, if the input data are represented in the form of u0433u043eu0440u0438u0437u043eu043du0442u0430u043bu0435u0439, includes the following steps: the horizontal u043fu0440u043eu0432u0435u0440u00a0u044eu0442 on closure, u043du0435u0437u0430u043cu043a referred to the design efficiency at minimum linear trajectory points gap; confined laterally u0440u0430u0441u0442u0435u0440u0438u0437u0443u044eu0442 array heights by converting coordinates at u0435u043au0442u043eu0440u043du043eu0433u043e u0438u0437u043eu0431u0440u0430u0436u0435u043du0438u00a0 with stepthe specified solution; over the specified array u0432u044bu043fu043eu043bu043du00a0u044eu0442 operation u0441u0433u043bu0430u0436u0438u0432u0430u043du0438u00a0; the array is in a three-dimensional surface.;13. method u043fu043eu0441u0442u0440u043eu0435u043du0438u00a0 terrain, if the input data are in the form of marks heights, includes the following steps: generating the grid coordinates and u0438u043du0434u0435u043au0441u043e in the fixed step; generating the mesh triangles on the basis of the reference elevation; u0432u044bu0447u0438u0441u043bu00a0u044eu0442 coordinates. the first grid for the second; u043fu0440u0438u0441u0432 u0430u0438u0432u0430u044eu0442 coordinates computed in the previous step of the first grid coordinates.
展开▼