首页> 外国专利> HOW TO IMPROVE SOLID loess soil subsidence in the foundation of buildings and structures and Injectors for grouting in the aquifer SERIES OF SOLID

HOW TO IMPROVE SOLID loess soil subsidence in the foundation of buildings and structures and Injectors for grouting in the aquifer SERIES OF SOLID

机译:如何改善建筑物和建筑物基础中的固体黄土沉降以及固体层系列注浆器

摘要

1.method of u0443u043bu0443u0447u0448u0435u043du0438u00a0 u043bu0435u0441u0441u043eu0432u043eu0433u043e u043fu0440u043eu0441u0430u0434u043eu0447u043du043eu0433u043e soil at the base of buildings and structures, including a sealing surface of soil, and it distributes u0435u043bu044cu043du043eu0433u043e the element area u043eu0441u043du043eu0432u0430u043du0438u00a0, u0441u0432u00a0u0437u0430u043du043du043eu0435 consistently with the installation of reinforcement nets and pour u0436u0435u043bu0435u0437u043eu0431u0435u0442u043eu043du043du043eu0439 slabseducation through the drilling u0441u043du0430u0440u00a0u0434u0430 in chess u043fu043eu0440u00a0u0434u043au0435 u0440u00a0u0434u043eu0432 wells with even step inside the contour of the element, with the deployment of one p u0440u0435u0434u0435u043bu0430u043cu0438 contour, the introduction into the soil through the injectors locked up in wells u0443u043bu0443u0447u0448u0430u044eu0449u0435u0433u043e solution in the form of a slurry under pressure u0433u0438u0434u0440u043eu0440u0430u0437u0440u044bu0432u0430 soil, and subsequent to u0433u043du0435u0442u0430u043du0438u0435 in soil u0442u0432u0435u0440u0434u0435u044eu0449u0435u0433u043e material in the form of cement sand grout.the education on the depth of the treated zones, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 in that period u0432u043eu0437u0432u0435u0434u0435u043du0438u00a0 distribution of the element u043eu0441u043du043eu0432u0430u043du0438u00a0 square, in front of the hall u0438u0432u043au043eu0439 u0436u0435u043bu0435u0437u043eu0431u0435u0442u043eu043du043du043eu0439 plate to the reinforcing grid u043fu0440u0438u043au0440u0435u043fu043bu00a0u044eu0442 switch tubes, in which, after u0432u043eu0437u0432u0435u0434u0435u043du0438u00a0 distribution of the elements and form well, in that these pipes are housed with stepa multiple step rods reinforcement nets and equal step u0440u0430u0437u043cu0435u0449u0435u043du0438u00a0 wells, and through the injectors, lost in the wells u0440u00a0u0434u0430 located outside the contour of u043du0435u0441u0443u0449 the element u0432u0432u043eu0434u00a0u0442 improving and up u0442u0432u0435u0440u0434u0435u044eu0449u0438u0439 solutions in the direction of the coolant in a fan formation on the sector of 180.;2. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the improvement of soil u043bu0435u0441u0441u043eu0432u043eu0433u043e u043fu0440u043eu0441u0430u0434u043eu0447u043du043eu0433u043e in complicated u0443u0441u043bu043eu0432u0438u00a0u0445 at one point u0438u043du044au0435u043au0442u0438u0440u043eu0432u0430u043du0438u00a0 place, less first, two switch tubes through which form a borehole and dip injectors u0434u043bu00a0 u0437u0430u043au0440u0435u043fu043bu0435u043du0438u00a0 soil mass at different depths.;3. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 2, so that each point u0438u043du044au0435u043au0442u0438u0440u043eu0432u0430u043du0438u00a0 second mortgage pipe, u0434u043bu00a0 u043fu043eu0433u0440u0443u0436u0435u043du0438u00a0 in her second u0438u043du044au0435u043au0442u043eu0440u0430 are housed in the same u0440u0430u0441u0441u0442u043eu00a0 of, for example 0.5 m from the first one of the lines, at the same u043du0430u043fu0440u0430u0432u043bu0435u043du0438u00a0 u0434u0435u0439u0441u0442u0432u0438u00a0 vectors of u0432u043eu0437u0434u0435u0439u0441u0442u0432u0438u00a0 on the ground of the first u0438u043du044au0435u043au0442u043eu0440u0430.;4. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 2, so that at one point u0438u043du044au0435u043au0442u0438u0440u043eu0432u0430u043du0438u00a0 when using at least two u0438u043du044au0435u043au0442u043eu0440u043eu0432, u0432u0432u043eu0434u00a0u0442 improving and up u0442u0432u0435u0440u0434u0435u044eu0449u0438u0439 u0440u0430u0441u0442u0432u043e in the first u0438u043du044au0435u043au0442u043eu0440 might only after u043fu043eu0433u0440u0443u0436u0435u043du0438u00a0 to project the second u0438u043du044au0435u043au0442u043eu0440u0430, both u0438u043du044au0435u043au0442u043eu0440u0430 after u0438u043du044au0435u043au0442u0438u0440u043eu0432u0430u043du0438u00a0 have not.;5. way on any of the u043fu043f.1 and 4, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, u0437u0430u0442u0440u0443u0431u043du043eu0435 space of each u0438u043du044au0435u043au0442u043eu0440u0430, between the pipe and the walls of the wells after the project was u043fu043eu0433u0440u0443u0436u0435u043du0438u00a0 binu, u0437u0430u043fu043eu043bu043du00a0u044eu0442 u0442u0432u0435u0440u0434u0435u044eu0449u0438u043c material in the form of cement sand grout, u043fu0440u0438u043cu0435u043du00a0u0435u043cu043eu0433u043e u0434u043bu00a0 u043du0430u0433u043du0435u0442u0430u043du0438u00a0 in u0437u0430u043au0440u0435u043fu043bu00a0u0435u043cu044bu0439 array.;6. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the internal diameter of the pipe for the mortgage, maximum diameter of drilling u0441u043du0430u0440u00a0u0434u0430.;7. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 p.6, so that in use u0434u043bu00a0 u043eu0431u0440u0430u0437u043eu0432u0430u043du0438u00a0 wells in plastic u043bu0435u0441u0441u043eu0432u044bu0445 u043fu0440u043eu0441u0430u0434u043eu0447u043du044bu0445 soil u0448u043du0435u043au043eu0432u043eu0433u043e drilling u0441u043du0430u0440u00a0u0434u0430 internal di u0430u043cu0435u0442u0440 mortgages of choose of u0443u0441u043bu043eu0432u0438u00a0 u043eu0431u0435u0441u043fu0435u0447u0435u043du0438u00a0 clearance with the outer diameter of the u0448u043du0435u043au0430 not more than 0.005 m.;8. way on any of the u043fu043f.6 and 7, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, using u0448u043du0435u043au043eu0432u043eu0433u043e drilling u0441u043du0430u0440u00a0u0434u0430 u0434u043bu00a0 u043eu0431u0440u0430u0437u043eu0432u0430u043du0438u00a0 wells in plastic u043bu0435u0441u0441u043eu0432u044bu0445 u043fu0440u043eu0441u0430u0434u043eu0447u043du044bu0445 soil. who u043du0430u043bu0438u043fu0430u043du0438u044e, as mortgage choice is the square u0441u0435u0447u0435u043du0438u00a0.;9. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the length of the mortgage choice at 0.05 m greater than the thickness of the pipe u0436u0435u043bu0435u0437u043eu0431u0435u0442u043eu043du043du043eu0439 slabs.;10. way on any of the u043fu043f.1 and 2, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 so that the outer diameter of the pipe to choose mortgage equal to no more than half step of the reinforcement nets minus di u0430u043cu0435u0442u0440u0430.;11. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the u0436u0435u043bu0435u0437u043eu0431u0435u0442u043eu043du043du043eu0439 pour plates, for example, at the same time, with the u043fu0440u0438u043au0440u0435u043fu043bu0435u043du0438u0435u043c to reinforcing grid of mortgages in the top end of the pipe. the last set safety tampon, for example, from rags.;12. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the switch tubes, in front of their u043fu0440u0438u043au0440u0435u043fu043bu0435u043du0438u0435u043c to reinforcement grid, set at a lower end of the pillow, which u043eu0431u0440u0430u0437u043eu0432u044bu0432 u0430u044eu0442 by backfilling sand inside placed at the point of u0438u043du044au0435u043au0442u0438u0440u043eu0432u0430u043du0438u00a0 mortgages pipes and u043fu0435u0440u0435u043fu043eu0434u044au0435u043cu043eu043c at a height that u043eu0442u0441u044bu043fu043au0443 part and the outer diameter of the pipes of the mortgage.;13. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 p.12, that, in the education of sand cushion of sand high humidity to mortgage the pipes, with their u043fu0435u0440u0435u043fu043eu0434u044au0435u043cu0435 supply shock u043du0430u0433u0440u0443 u0437u043au0443.;14.u0438u043du044au0435u043au0442u043eu0440 u0434u043bu00a0 u0437u0430u043au0440u0435u043fu043bu0435u043du0438u00a0 soil, including pipe, hollow body with u043eu0442u0432u0435u0440u0441u0442u0438u00a0u043cu0438 outlets located in the chess u043fu043eu0440u00a0u0434u043au0435 in longitudinal u0440u00a0u0434u0430u0445 underlying flat u0441u0442u00a0u0445, u043fu0440u043eu0445u043eu0434u00a0u0449u0438u0445 through the longitudinal axis of the hollow u0438u043du044au0435u043au0442u043eu0440u0430, and firmly established the tip, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, all vent openings in the longitudinal u0440u00a0u0434u044b u044bu043fu043eu043bu043du0435u043du044b half the circumference of the hollow shell.the number of still u043fu00a0u0442u0438 and placed in the centre plane of the hollow shell u0438u043du044au0435u043au0442u043eu0440u0430 under equal angles equal to 45.
机译:1. u0443 u043b u0443 u0447 u0448 u0435 u043d u0438 u00a0 u043b u0435 u0441 u0441 u043e u0432 u043e u0433 u0433 u043e u043e u043f u0440 u043e u0441 u0430 u0434 u043e u0447 u043d u043e u0433 u043e土壤(包括土壤的密封面)在建筑物和结构的底部分布,并且将 u0435 u043b u044c u043d u043d u0433 u0433 u043e u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0, u0441 u0432 u00a0 u0437 u0430 u043d u043d u043e u0435始终与加固网和浇注 u0436 u0435 u043b u0435 u0437 u043e u0431 u0435 u0442 u043e u043d u043d u043d u043e u0439通过棋盘上的钻孔 u0441 u043d u0430 u0440 u00a0 u0434 u0430 u00a0 u0434 u043a u0435 u0440 u00a0 u0434 u043e u0432孔在元素轮廓内均匀分布,并部署了一个p u0440 u0435 u0434 u0435 u043b u0430 u043c u0438轮廓,通过锁定在井中的喷油器引入土壤 u04 43 u043b u0443 u0447 u0448 u0430 u044e u0449 u0435 u0433 u043e在压力下呈浆液形式的溶液 u0433 u0438 u0434 u0440 u043e u0440 u0430 u0437 u0440 u044b u0432 u0430土壤,以及 u0432 u0432 u043d u0435 u0434 u0435中的 u0433 u043d u0435 u0432 u0432 u043d u0435 u0435 u0434 u0435 u0435以水泥砂浆的形式进行的。关于受处理区深度的教育,在该时期内是 u0432 u043e u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u0040 u0437 u0432 u0435 u0434 u0435 u043d u0438 u00a0元素分布 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0正方形,位于大厅前 u0438 u0432 u043a u043e u0439 u0436 u0435 u043b u0435 u0437 u043e u0431 u0435 u0442 u043e u043d u043d u043d u043e u0439板到加强网格 u043f u0440 u0438 u043a u0440 u0435 u043f u043b u00a0 u044e u0442开关管,其中,在 u0432 u043e u0437 u0432 u0435 u0434 u0435 u043d u043d u0438 u00a0分配后元件和形状良好的地方在于,这些管道中装有阶梯形多级杆加强网,并通过注入器等距 u0440 u0430 u0437 u043c u0435 u0449 u0435 u043d u0438 u00a0井,丢失在 u043d u0435 u0441 u0443 u0449轮廓之外的井 u0440 u00a0 u0434 u0430中,元素 u0432 u0432 u043e u0434 u00a0 u0442不断完善和向上 u0442 u0432 u0435 u0440 u0434 u0435 u044e u0449 u0438 u0439解决方案在180扇形扇形处的冷却液方向上进行; 2。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,从而改善土壤 u043b u0435 u0441 u0441 u0441 u0431 u043e u0432 u043e u0433 u043e u043f u0440 u043e u0441 u0430 u0434 u043e u0447 u043d u043e u0433 u043e在复杂的 u0443 u0441 u043b u043e u0432 u0438 u00a0 u0445在一个点 u0438 u043d u044a u0435 u043a u0442 u0438 u0440 u043e u0432 u0430 u043d u0438 u00a0位置,少先,两个开关管通过它们形成钻孔和浸入式注水器 u0434 u043b u00a0 u0437 u0430 u043a u0440 u0435 u043f u043b u0435 u043d u0438 u00a0不同深度的土壤质量; 3。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 2的方法,这样每个点 u0438 u043d u044a u0435 u043a u043a u0442 u0438 u0440 u043e u0432 u0430 u043d u0438 u00a0第二个抵押管道, u0434 u043b u00a0 u043f u043e u0433 u0440 u0443 u0436 u0435 u043d u0438 u00a0在她的第二个 u0438 u043d u044a u0435 u043a u0442 u043e u0440 u0430位于同一 u043d u0440 u0430 u0441 u0441 u0442 u043e u00a0所在的位置,例如,距第一条线的距离为0.5 m。 u0430 u043f u0440 u0430 u0432 u043b u0435 u043d u0438 u00a0 u0434 u0435 u0439 u0441 u0442 u0432 u0432 u0438 u00a0向量的 u0432 u043e u0437 u0434 u0435 u0441 u0442 u0432 u0438 u00a0,第一个 u0438 u043d u044a u0435 u043a u0442 u043e u0440 u0430。; 4。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 2的方法,因此在某一点 u0438 u043d u044a u0435 u0435 u043a u043a u0442 u0438 u0440使用至少两个 u0438 u043d u044a u0435 u043a u0442 u043e u04e u0440 u043e u0432, u0432 u0432 u0432 u043e u0434 u00a0 u0442时的u043e u0432 u0430 u043d u0438 u00a0及以上 u0442 u0432 u0435 u0440 u0434 u0435 u044e u0449 u0438 u0439 u0440 u0430 u0441 u0442 u0432 u0432 u043e在第一个 u0438 u043d u043d u043a u0435 u043a u0442 u043e u0440可能仅在 u043f u043e u0433 u0440 u0443 u0436 u0435 u043d u043d u0438 u00a0之后才能投影第二个 u0438 u043d u044a u0435 u043a u0442 u043e u0440 u0430 u0438 u043d u044a u0435 u043a u0442 u0438 u0440 u043e u043e u0432 u0430 u043d u0438 u00a0之后 u0438 u043d u044a u0435 u043a u0442 u043e u0440 u0430。 ; 5。 u043f u043f.1和4中的任何一个的方式, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0, u0437 u0430 u0430 u0442 u0440 u0443 u0431 u043d u043e u0435每个 u0438 u043d u044a u0435 u043a u0442 u043e u0440 u0430的空间在项目完成后,管道和井壁之间是 u043f u043e u0433 u0440 u0443 u0436 u0435 u043d u0438 u00a0 binu, u0437 u0430 u043f u043f u043e u043e u043b u043d u00a0 u044e u0442 u0442 u0432 u0435 u0440 u0434 u0435 u044e u0449 u0438 u043c是以水泥砂浆形式存在的材料, u043f u0440 u0438 u043c u0435 u043d u043d u00a0 u0435 u043c u043e u0433 u043e u0434 u043b u00a0 u043d u0430 u0433 u043d u043d u0435 u0432 u0430 u043d u043d u0438 u00a0 in u0437 u0430 u043d u043a u0440 u0435 u043f u04300 u0435 u043c u044b u0439数组;; 6。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,以便抵押的管道的内径为最大钻孔 u0441 u043d u0430 u0440 u00a0 u0434 u0430。; 7。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0第6页的方法,以便在使用中 u0434 u043b u00a0 u043e u0431 u0440 u0430 u0437 u043e u0432 u0430 u043d u0438 u00a0塑料孔 u043b u0435 u0441 u0441 u043e u0432 u044b u0445 u043f u0440 u043e u0441 u0441 u0430 u0434 u043e u0447 u043 u044b u0445土壤 u0448 u043d u0435 u043a u043e u0432 u043e u0433 u043e u043e钻孔 u0441 u043d u0430 u0440 u0440 u00a0 u0434 u0430内部di u0430 u043c u0435 u0442 u0430 u0443 u0441 u043b u043e u0432 u0438 u00a0 u043e u0431 u0435 u0441 u043f u0435 u0447 u0435 u043d u0438 u00a0的外径的选择 u0435 u043a u0430不超过0.005 m .; 8。在 u043f u043f.6和7中的任何一个上,使用 u0448 u043d u043d u0441 u0040,u043b u0438 u0438 u0439 u0441 u0040,u043a u043a u043e u0432 u043e u0433 u043e钻孔 u0441 u043d u0430 u0440 u00a0 u0434 u0430 u0434 u043b u00a0 u043e u0431 u0440 u0430 u0430 u0437 u043e u0432 u0430 u04330 u043d在塑料 u043b u0435 u0441 u0441 u043e u0432 u044b u0445 u043f u0440 u043e u0441 u0430 u0434 u043e u0447 u043d u043d u044b u0445谁 u043d u0430 u043b u0438 u043f u0430 u043d u0438 u044e,作为抵押选择是正方形 u0441 u0435 u0447 u0435 u043d u0438 u00a0。; 9。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,以便抵押选择的长度在0.05 m处大于管道的厚度 u0436 u0435 u043b u0435 u0437 u043e u0431 u0435 u0442 u043e u043d u043d u043e u0439楼板; 10。 u043f u043f.1和2中的任何一个的方式, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0以便选择抵押的管道的外径相等最多不超过加固网的一半减去di u0430 u043c u0435 u0442 u0440 u0430。; 11。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,因此 u0436 u0435 u043b u0435 u0437 u0437 u043e u0431 u0435 u0442 例如,同时用 u043f u0440 u0438 u043a u0440 u0435 u043f u043b u0435 u043d u0438 u0435 u043c将板同时倒入u043e u043d u043d u043e u0439管道顶端的抵押贷款网格。最后设置的卫生棉条,例如来自抹布的; 12。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,以便开关管在其 u043f u0440 u0438 u0433 u043a u0440 u0435 u043f u043b u0435 u043d u0438 u0435 u043c设置在枕头的下端,其中 u043e u0431 u0440 u0430 u0437 u043e u0432 u044b u0432 u0430 u044e通过在 u0438 u043d u044a u0435 u043a u0442 u0438 u0440 u043e u0432 u0430 u043d u043d u0438 u00a0抵押管道和 u043f u0435 u0440 u0435点处的内部回填沙子 u043f u043e u0434 u044a u0435 u043c u043e u043c的高度和抵押物的管道的外径以及管子的外径相同; 13。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 p.12的方法,即在沙质高湿度沙垫教育中抵押管道,并用 u043f u0435 u0440 u0435 u043f u043e u0434 u044a u0435 u043c u0435供应冲击 u043d u0430 u0433 u0440 u0443 u0437 u043a u0443。; 14. u0438 u043d u044a u0435 u043a u0442 u043e u0440 u0434 u043b u00a0 u0437 u0430 u043a u0440 u0435 u043f u043b u0435 u043d u0438 u00a0土壤,包括管道,带有 u043e u0442的空心体u0432 u0435 u0440 u0441 u0442 u0438 u00a0 u043c u0438位于纵向 u0440 u00a0 u0434 u0430 u0445底层棋的 u043f u043e u0440 u00a0 u0434 u043a u0435 u0441 u0442 u00a0 u0445, u043f u0440 u043e u0445 u043e u0434 u00a0 u0449 u0438 u0445穿过空心 u0438 u043d u044a u0435 u043a u0442 u043e u0440 u0430,并牢固建立了提示, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0,所有排气孔的长度为 u0440 u00a0 u0434 u044b u044b u043f u043e u043b u043d u0435 u043d u044b空心壳体圆周的一半。仍然为 u043f u00a0 u0442 u0438并以等于45°的相等角度放置在空心壳体 u0438 u043d u044a u0435 u043a u0442 u043e u0440 u0430的中心平面中。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号