首页> 外国专利> Support assembly for roof element of shelter, has hoop fixed to central mast for receiving central part of sheet held between frame and assembly, flange fixed to mast in upper part of mast, and clamp ring mounted and locked on mast

Support assembly for roof element of shelter, has hoop fixed to central mast for receiving central part of sheet held between frame and assembly, flange fixed to mast in upper part of mast, and clamp ring mounted and locked on mast

机译:庇护所屋顶元件的支撑组件,具有固定在中央桅杆上的环箍,用于容纳固定在框架和组件之间的板材的中央部分,法兰固定在桅杆上部的桅杆上,以及安装环并固定在桅杆上

摘要

The assembly (10) has a central mast (18), and a hoop (20) fixed to the central mast for receiving a central part of a sheet that is held between a frame and the assembly. A flange (22) is fixed to the central mast in an upper part of the central mast and includes a set of radial pulleys (26). A clamp ring (24) is slidingly mounted and locked on the central mast. A set of cables (28) are provided, where each cable includes an end that is fixed to the clamp ring and passed on one of the pulleys. An independent claim is also included for a method for assembling a shelter.
机译:组件(10)具有中央桅杆(18)和固定在中央桅杆上的箍(20),用于接收保持在框架和组件之间的片材的中央部分。凸缘(22)固定在中央桅杆的上部中的中央桅杆上,并且包括一组径向皮带轮(26)。夹紧环(24)滑动安装并锁定在中央门架上。提供了一组缆线(28),其中每条缆线均包括一端,该一端固定到夹紧环并通过一个滑轮。还包括用于组装遮蔽物的方法的独立权利要求。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号