首页>
外国专利>
ELEVATOR COMPONENT IMPROVEMENT SCHEDULE SYSTEM AND ELEVATOR COMPONENT IMPROVEMENT SCHEDULE METHOD
ELEVATOR COMPONENT IMPROVEMENT SCHEDULE SYSTEM AND ELEVATOR COMPONENT IMPROVEMENT SCHEDULE METHOD
展开▼
机译:电梯部件改进时间表系统和电梯部件改进时间表方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To analyze failure factor of a component forming an elevator.;SOLUTION: Shipment information DB 11 stores shipment information containing component identification information for identifying an elevator component and client identification information for identifying shipping destination of the component. Maintenance information DB 12 stores maintenance information containing failure occurrence information representing failure occurrence of the component identified by the component identification information in association with the component identification information contained in the shipment information. Use environment information DB 14 stores use environment information representing the usage state of the component identified by the component identification information in association with the component identification information contained in the shipment information. An analysis section 153 extracts the maintenance information and use environment information associated with the component identification information identifying a target component designated by a user. The analysis section 153 analyzes the failure factor of the target component based on the maintenance information and use environment information. An input/output section 16 outputs a result analyzed by the analysis section 153.;COPYRIGHT: (C)2009,JPO&INPIT
展开▼