REPLACEMENT METHOD FOR MAIN COLUMN MATERIAL OF STEEL PIPE TOWER AND CONNECTION FIXTURE STRUCTURE USED FOR THE SAME
REPLACEMENT METHOD FOR MAIN COLUMN MATERIAL OF STEEL PIPE TOWER AND CONNECTION FIXTURE STRUCTURE USED FOR THE SAME
展开▼
机译:钢管塔主柱材料的更换方法及其所用的连接装置结构
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To obtain a replacement method for a main column material which enables the replacement of a defective main column material to be simply and rapidly carried out by providing a connection fixture structure suitable for the steel pipe main column material of a steel pipe tower.;SOLUTION: The replacement method for the main column material comprises a process for mounting the connection fixture structure on the main column material to be replaced, a process for assembling a temporary surrounding iron tower, a process for installing a temporary arm to the temporary surrounding iron tower and transferring an electric wire support device, a process for loosening the upper flange bolt of the main column material to be replaced, a process for hanging up a leg corresponding to the main column material to be replaced with a predetermined distance, and a process for replacing the main column material with a new one. The connection fixture structure comprises a connection plate with a predetermined length, a pair of first bands divided into two bands supported on the connection plate, a pair of second bands divided into two bands which are detachably bolted to the first bands divided into two bands, and a connecting angle steel member with a predetermined length supported on the other side of the connection plate. The two-divided band is frictionally fixed to the main column material of the steel pipe tower with bolts.;COPYRIGHT: (C)2010,JPO&INPIT
展开▼