首页> 外国专利> REPAIR METHOD OF STEEL SHEET-PILE STRUCTURE AND WORKING BARGE FOR REPAIR

REPAIR METHOD OF STEEL SHEET-PILE STRUCTURE AND WORKING BARGE FOR REPAIR

机译:钢板桩结构的修补方法及工作驳船

摘要

PROBLEM TO BE SOLVED: To perform repair work on a steel sheet-pile structure by using a dedicated work barge and easily installing a water cut-off box to a prescribed location from sea-side work.;SOLUTION: In a repair method for performing repair work by installing the water cut-off box 3 for repair work to the steel sheet-pile structure 51, the work barge 1 with the water cut-off box 3 and a lifting and transferring device 4 is moored with an interval S between its starboard 1a and a quay wall 50. The water cut-off box 3 lifted by the lifting and transferring device 4 is made close to the steel sheet-pile structure 51 of the quay wall 50 from the side of the work barge 1 and lowered to a prescribed height from between the work barge 1 and the quay wall 50. The water cut-off box 3 is installed in such a way that the front surface of the water cut-off box 3 may be opposed to the steel sheet-pile structure 51 into contact with it to discharge water from the inside of the water cut-off box 3, secure a prescribed work space, and perform repair work.;COPYRIGHT: (C)2009,JPO&INPIT
机译:解决的问题:通过使用专用的工作驳船对钢板桩结构进行维修工作,并轻松地将防水箱安装到海边工作的指定位置。通过在钢板桩结构51上安装维修用的除水盒3来进行维修工作,将具有该除水盒3的工作驳船1和提升和转移装置4之间以间隔S系泊。右舷1a和码头壁50。由升降传送装置4提升的防水箱3从作业驳船1的一侧靠近码头壁50的钢板桩结构51。从工作驳船1和码头壁50之间起规定的高度。分水箱3以分水箱3的前表面与钢板桩结构相对的方式安装51与之接触以从分水槽内部排出水x 3,确保规定的工作空间,并进行维修工作。;版权所有:(C)2009,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号