首页> 外国专利> Man-hour automatic calculation system, man-hour automatic calculation method and program thereof

Man-hour automatic calculation system, man-hour automatic calculation method and program thereof

机译:工时自动计算系统,工时自动计算方法及其程序

摘要

PPROBLEM TO BE SOLVED: To provide a system for automatic man-hour calculation which works out a high-accuracy estimation, taking into account a work/assembly process, without using CAD data and without being affected by designing means. PSOLUTION: The automatic man-hour calculation system comprises: a process setting means that sets the work and assembly process of a component from assembly information and component shape information of sheet metal work created by a CAM system; a process element extracting means that analyzes the process information set by the process setting means and extracts process element information; a standard time searching means that searches a standard time for the work corresponding to the process element; and a man-hour calculating means that calculates the man-hour from the extracted process element and the searched standard time. PCOPYRIGHT: (C)2004,JPO
机译:

要解决的问题:提供一种用于自动工时计算的系统,该系统可以在不考虑CAD / CAD数据且不受设计手段影响的情况下,考虑到工作/装配过程,进行高精度估算。

解决方案:自动工时计算系统包括:过程设置装置,其根据由CAM系统创建的钣金工件的装配信息和部件形状信息来设置部件的工作和装配过程;处理要素提取单元,对由处理设定单元设定的处理信息进行解析,并提取处理要素信息。标准时间搜索是指在标准时间中搜索与流程元素相对应的工作;工时计算装置,其根据所提取的处理要素和搜索到的标准时间来计算工时。

版权:(C)2004,日本特许厅

著录项

  • 公开/公告号JP4234405B2

    专利类型

  • 公开/公告日2009-03-04

    原文格式PDF

  • 申请/专利权人 東芝エレベータ株式会社;

    申请/专利号JP20020345432

  • 发明设计人 西村 太郎;

    申请日2002-11-28

  • 分类号G05B19/418;G06Q50;

  • 国家 JP

  • 入库时间 2022-08-21 19:37:07

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号