首页>
外国专利>
Pull Planning for Unserviceable Parts in Connection With On-Demand Repair Planning
Pull Planning for Unserviceable Parts in Connection With On-Demand Repair Planning
展开▼
机译:与按需维修计划相关的无法维修零件的拉动计划
展开▼
页面导航
摘要
著录项
相似文献
摘要
In one embodiment, planning repairs in response to demand in a multi-level repair network includes accessing a forecasted demand for serviceable parts at a repair location and, for each inspected unserviceable part at the location that is not repairable at the location: (1) planning a move of the part to an upstream repair location such that the part can be available for repair at the upstream location at an estimated earliest time; (2) estimating a latest time at which a repair of the part can begin at the upstream location to help satisfy the forecasted demand, according to the forecasted demand and the estimated earliest time, and planning a repair at the upstream location at the estimated latest time; and (3) re-planning the move, according to the start time of the repair, by modifying a move delivery time according to a repair start time and modifying a move start time according to the modified delivery time. The re-planned move start time is an estimated latest time at which the part can be moved to the upstream location for repair to help satisfy the forecasted demand.
展开▼