首页> 外文会议>Annual Water Environment Federation technical exhibition and conference >Pulling It All Together: Louisville MSD's Critical Repair and Reinvestment Plan
【24h】

Pulling It All Together: Louisville MSD's Critical Repair and Reinvestment Plan

机译:齐心协力:路易斯维尔MSD的关键维修和再投资计划

获取原文

摘要

In 2017, Louisville MSD (MSD) completed a process to produce a Critical Repair and Reinvestment Plan (CRRP) to cover all its system; including wastewater, stormwater, flood protection, property management, and programmatic systems for the next 20-years. As MSD approached completion of a wet weather-related Consent Decree, a new long-term plan for the agency would be needed. The projects developed to complete the Consent Decree were well documented and prioritized but only addressed overflow control. MSD's other areas of responsibility did not have the same level of vision and the previous planning for them was scattered across numerous documents often created in silos. There was a need for a consistent approach to create a single, comprehensive plan for MSD's next 20 years.
机译:2017年,路易斯维尔MSD(MSD)完成了一项流程,以制定涵盖所有系统的关键维修和再投资计划(CRRP);包括未来20年的废水,雨水,防洪,物业管理和程序系统。随着MSD即将完成与潮湿天气有关的同意令,该机构需要一个新的长期计划。为完成同意书法令而开发的项目已得到充分记录和优先排序,但仅解决了溢出控制问题。 MSD的其他职责范围并没有相同的视野,因此先前针对它们的计划分散在通常是单独创建的众多文档中。需要一种一致的方法来为MSD的下一个20年制定一个单一的全面计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号