首页> 外国专利> Generating planning-level time and capacity requirement formulas for manufacturing processes

Generating planning-level time and capacity requirement formulas for manufacturing processes

机译:生成制造过程的计划级时间和产能需求公式

摘要

Methods, computer program products and systems are disclosed for generating a planned time duration for a manufacturing process operation defined for planning purposes that includes an aggregation of multiple defined execution operations. Electronic information is received that specifies a production demand that requires use of the manufacturing process for fulfillment. A linear approximation is electronically generated of an overall time duration measure for the defined manufacturing process planning operation. The overall time duration measure is a sum of time components comprising at least a calculated measure for a variable time component for the longest of the multiple execution operations for the received production demand, and a fixed time duration measure for one send-ahead quantity for each of the multiple execution operations that is not the longest. The generated overall time duration measure is then returned.
机译:公开了用于为制造过程操作生成计划的持续时间的方法,计算机程序产品和系统,该制造过程操作为计划目的而定义,包括多个定义的执行操作的集合。收到指定生产需求的电子信息,该生产需求需要使用制造过程来实现。对于定义的制造过程计划操作,将以电子方式生成总持续时间测量值的线性近似值。总体持续时间量度是时间分量的总和,包括至少一个针对接收到的生产需求的多个执行操作中最长的可变时间分量的计算量度,以及每个时间提前量的固定持续时间量度最长的多个执行操作中的一个。然后返回生成的总持续时间度量。

著录项

  • 公开/公告号US7617015B2

    专利类型

  • 公开/公告日2009-11-10

    原文格式PDF

  • 申请/专利权人 JOCHEN STEINBACH;JAAKOB KIND;

    申请/专利号US20060614880

  • 发明设计人 JOCHEN STEINBACH;JAAKOB KIND;

    申请日2006-12-21

  • 分类号G06F19/00;G04F7/00;G04F10/00;G06F9/44;G06F17/50;

  • 国家 US

  • 入库时间 2022-08-21 19:30:25

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号