首页> 外国专利> hydroelectric tunneling and executive process of hydroelectric tunneling

hydroelectric tunneling and executive process of hydroelectric tunneling

机译:水电隧洞及水电隧洞的执行过程

摘要

TUNING HYDROELECTRIC AND EXECUTIVE TUNING HYDROELECTRIC PROCESS. Tunneling hydroelectric power, capable of generating hydroelectric energy through the abstraction of water within the riverbed (G), uses their natural slopes (A, B) to power one or more submerged turbines (I-1) at downstream without the use of dams of any kind, called tunneling hydroelectric. Said hydroelectric, consisting of a set of pipes of large diameters, (O5) that seated in the riverbed, lead downstream water, where at the end of them are placed low-power submerged turbines for energy production.
机译:调整水力和执行调整水力过程。隧道式水力发电能够通过提取河床内的水来产生水能(G),利用其自然坡度(A,B)为下游的一台或多台水下涡轮机(I-1)供电,而无需使用水坝任何一种称为隧道水力发电的技术。所述水力发电装置由一组大直径(O5)的管道组成,这些管道位于河床中,引导下游的水流,在水流的末端放置低功率的水下涡轮机,用于发电。

著录项

  • 公开/公告号BRPI0800590A2

    专利类型

  • 公开/公告日2009-09-22

    原文格式PDF

  • 申请/专利权人 ANSELMO AZEVEDO DUARTE;

    申请/专利号BR2008PI00590

  • 发明设计人 ANSELMO AZEVEDO DUARTE;

    申请日2008-01-30

  • 分类号E02B9;

  • 国家 BR

  • 入库时间 2022-08-21 19:28:22

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号