首页> 美国政府科技报告 >Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with Environmental Protection Agency for the RE-Powerring America's Land Initiative: Siting Renewable Energy
【24h】

Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with Environmental Protection Agency for the RE-Powerring America's Land Initiative: Siting Renewable Energy

机译:Jeddo矿排水隧洞水电安装经济性和性能可行性研究。与环境保护局合作编写的一份研究报告,旨在重新启动美国的土地倡议:选址可再生能源

获取原文

摘要

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号