首页> 外国专利> A METHOD AND A CONTINUOUS CASTING AND ROLLING INSTALLATION FOR PRODUCING HOT-ROLLED STRIP WITH A DUAL-PHASE MICROSTRUCTURE

A METHOD AND A CONTINUOUS CASTING AND ROLLING INSTALLATION FOR PRODUCING HOT-ROLLED STRIP WITH A DUAL-PHASE MICROSTRUCTURE

机译:双相组织生产热轧带钢的方法及连铸连轧的安装

摘要

The aim of the invention is to be able to produce dual-phase steels under local conditions even in the existing cooling section of a continuous casting and rolling plant by means of controlled cooling of the hot-rolled strip in two cooling stages following the forming process. Said aim is achieved by respecting the chemical composition of the initial steel within precisely defined limits and cooling in two stages from a finished rolled strip temperature Tfinish of ASUB3/SUB -100K Tfinish ASUB3/SUB -50K to a coiling strip temperature Tcoiling of 300 °C ( initial martensite temperature), the cooling speed VSUB1,2/SUB in both cooling stages ranging between 30 and 150 K/s, preferably between 50 and 90 K/s. The first cooling stage is carried out until the cooling curve enters the ferrite range, whereupon the heat released by the transformation of the austenite into ferrite is used for isothermally holding the obtained strip temperature Tconst during a holding time of = 5 s until the beginning of the second cooling stage
机译:发明内容本发明的目的是通过在成形过程之后的两个冷却阶段中通过在两个冷却阶段中对热轧带材的受控冷却,甚至在连续铸造和轧制设备的现有冷却区域中也能够在局部条件下生产双相钢。 。通过在精确定义的范围内考虑初始钢的化学成分并从A 3 -100K 3 < / SUB> -50K,直到<300°C(<初始马氏体温度)的卷取温度Tcoiling,两个冷却阶段的冷却速度V 1,2 在30至150 K / s之间,最好在50至90 K / s之间。进行第一个冷却阶段,直到冷却曲线进入铁素体范围,然后奥氏体转变为铁素体所释放的热量用于在= 5 s的保持时间内等温保持所获得的带钢温度Tconst直至开始。第二冷却阶段

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号