首页> 外国专利> METHOD FOR EXECUTION A WALL ENGINEERING WORKS CONSTRUCTION CONCRETE BLOCK STRUCTURE

METHOD FOR EXECUTION A WALL ENGINEERING WORKS CONSTRUCTION CONCRETE BLOCK STRUCTURE

机译:墙体工程施工混凝土砌块结构的执行方法

摘要

A block structure construction method for civil engineering wall is provided to facilitate construction and to shorten construction period because a unit block is transported to the construction side after being assembled and forming the unit block structure. A block structure construction method for civil engineering wall is as follows. A unit block(11) is assembled and the unit block structure(1) consisting of unit block combination is formed. The unit block structure is positioned on the floor of the construction position. The height of the unit block is controlled by scratching the construction floor through a plurality of work spaces(115) of the unit block structure. The work space is embedded using the concrete. At least one or more unit block structures(1') are assembled and installed on the unit block structure. The unit block comprises a side insertion hole(111), a side protrusion(112) and a horizontal space(117).
机译:提供一种用于土木工程墙的砌块结构施工方法,因为在组装并形成该砌块结构之后将砌块输送到施工侧,从而便于施工并缩短施工周期。土木工程墙的砌块结构施工方法如下。组装单元块(11),形成由单元块组合组成的单元块结构(1)。单元块结构位于施工位置的地板上。通过穿过单元块结构的多个工作空间(115)刮擦建筑地板来控制单元块的高度。工作空间是使用混凝土嵌入的。至少一个或多个单元块结构(1')被组装并安装在单元块结构上。单元块包括侧插入孔(111),侧突起(112)和水平空间(117)。

著录项

  • 公开/公告号KR20090084571A

    专利类型

  • 公开/公告日2009-08-05

    原文格式PDF

  • 申请/专利权人 AN JONG HWAN;

    申请/专利号KR20080010830

  • 发明设计人 AN JONG HWAN;

    申请日2008-02-01

  • 分类号E02B3/14;E02B3;

  • 国家 KR

  • 入库时间 2022-08-21 19:12:52

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号