首页> 外国专利> TAILING STABILITY METHOD OF RIVER AT MINE DISTRICT

TAILING STABILITY METHOD OF RIVER AT MINE DISTRICT

机译:矿区河道尾矿稳定方法

摘要

A tailing/waster rock stabilization method of river at closed mine region is provided to delay stream of the river through the flux reduction facility, thus preventing the corrosion of cover soil. A tailing/waster rock stabilization method of river at closed mine region comprises a step of forming a tailing/waster rock solidification layer(20) by supplying calcium hydroxide and water to a tailing/waster rock layer(T) between a tailing dam(D) and a concrete dam(10), a step of constructing a gravel layer(30) on the top of the tailing/waster rock layer and the tailing dam, a step of constructing a cover layer(40) lower than the concrete dam, and a step of constructing a flux reduction facility(50).
机译:提供了在封闭矿区的河流的尾矿/废物岩石稳定方法,以延迟通过通量减少设施的河流,从而防止覆盖土壤的腐蚀。在封闭矿区的河流的尾矿/废物岩石稳定方法包括通过向尾矿坝(D)之间的尾矿/废物岩石层(T)供应氢氧化钙和水来形成尾矿/废物岩石固化层(20)的步骤。 )和混凝土坝(10),在尾矿/废物岩层和尾矿坝的顶部构造砾石层(30)的步骤,在低于混凝土坝的构造覆盖层(40)的步骤,以及构造通量降低装置的步骤(50)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号