首页>
外国专利>
TAILING STABILITY METHOD OF RIVER AT MINE DISTRICT
TAILING STABILITY METHOD OF RIVER AT MINE DISTRICT
展开▼
机译:矿区河道尾矿稳定方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A tailing/waster rock stabilization method of river at closed mine region is provided to delay stream of the river through the flux reduction facility, thus preventing the corrosion of cover soil. A tailing/waster rock stabilization method of river at closed mine region comprises a step of forming a tailing/waster rock solidification layer(20) by supplying calcium hydroxide and water to a tailing/waster rock layer(T) between a tailing dam(D) and a concrete dam(10), a step of constructing a gravel layer(30) on the top of the tailing/waster rock layer and the tailing dam, a step of constructing a cover layer(40) lower than the concrete dam, and a step of constructing a flux reduction facility(50).
展开▼