首页>
外国专利>
METHOD FOR CONSTRUCTING A RIVERBANK REINFORCEMENT STRUCTURE AND A RIVERBANK REINFORCEMENT STRUCTURE CONSTRUCTED THEREBY
METHOD FOR CONSTRUCTING A RIVERBANK REINFORCEMENT STRUCTURE AND A RIVERBANK REINFORCEMENT STRUCTURE CONSTRUCTED THEREBY
展开▼
机译:构造河岸加固结构的方法及由此构造的河岸加固结构
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A construction method of a bank reinforcement structure and a bank reinforcement structure according to the same are provided to increase the coupling between a housing gabion installed on the bank surface and the bank surface and to prevent the soil which is filled within the housing gabion from leaking through the mesh bag. CONSTITUTION: A construction method of a bank reinforcement structure is as follows. In the bank surface formation step, a bank surface of a bank is organized. One or more insertion holes are drilled in a row with a regular interval(S10). In the anchor installation step, a pair of coupling anchors are inserted in the holes formed in the bank surface formation step and then the insertion holes are filled so the coupling anchor is fastened on the bank surface while being partially exposed(S20). In the assembly casting step, the coupling anchor is installed on the bank surface in the anchor installation step then a binding agent is applied to the bank surface to be exposed to the outside. In the wire netting box installation step, one side of the wire netting box is coupled with the opened wire netting box and the wire netting box is bonded with the bind agent(S40). In the hardening step, the soil is filled inside the wire netting box installed on top of the bank surface.
展开▼