首页> 外国专利> bridge river bridge box sleeve section of the safety diagnosis equipment

bridge river bridge box sleeve section of the safety diagnosis equipment

机译:桥河桥箱套筒段安全诊断设备

摘要

this design is the bridge and the top class business to settle on the left and right side on the bridge slab to the lower part of the support beam in the elastic support for the left and right side of the above is the evaluation of the safety of flood control in the department of the ministry of defense with the one in the aspects of the ubc29uce21uc120 shift with in the vertical section. the music department is vertical with the horizontal, vertical, and can be extended in the left and right side horizontal part can have the triangle area, will be formed around the triangle area of the left and right side with the lateral center of a life ub418uac8c fixed connection in the center. shanghai shen, as the center of the food to be put on hold. the annual fixed with the side of the fixed tube is respectively fixed with the combination of the shift in terms of how close to the fixed frame and is fixed in the first class; the class information of the room and the ub808uc784 side fixed on them. don't to be fixed in the fixed backing with fixed or fixed in turn to form a coil, fixed in the shaft hole on the side of the long axis of the screw is combined with the fixed interval can be fixed to the upper side through the formation of the bar the measuring device and the bar inserted through the extension of the line from the ball to the ball, the insert can have a meeting in conjunction with the formation of the party, in conjunction with the room, fixed nut ring are fixed on the side of it outsourcing, according to the standard of the extension of the line on the grid. all the brass in the display scale of the spring, and all the hidden state of the party, in conjunction with the insertion of the pipe through the through hole, the lower part of the penetration through the use of the line can be in to prevent the screw from a vertical bar uace0uc815ub418 with vertical bar group in the left and right side of the horizontal bar, and a horizontal bar with the fleet, with the vertical rise on the left and right side vertical bar on top, with the bridge slab, a lower end is fixed on the fixed plate, with y type operation to ud615uc131ub418 safety diagnosis. equipped with the same the sleeve section of the river bridge on the safety diagnosis equipment.;the original design of the bridge slab dated safety diagnosis equipment installation, the structure of the load of a bridge slab's deflection and bending and the more accurate measurement, and take this as the foundation, the safety of the bridge slab is possible effect.
机译:这种设计是将桥梁和一流的业务安放在桥板的左侧和右侧,将支撑梁的下部支撑在弹性支撑的左侧和右侧,以上是对安全性的评价国防部的防洪控制,其中 ubc29 uce21 uc120的偏移为垂直部分。音乐部是与水平方向垂直的,垂直的,并且可以在左右水平方向上延伸,可以有三角形的区域,将围绕三角形的区域形成具有左右生命中心的横向中心ub418 uac8c固定连接在中间。以上海申为中心的食品被搁置。固定在固定管侧面的圆环分别通过移位的组合固定在固定框附近,固定在第一类中。房间的类别信息和固定在其上的 ub808 uc784一侧。不要将固定在固定底衬上的固定件或轮流固定成一个线圈,固定在轴孔上的螺丝的长轴一侧与固定间隔相结合可通过固定到上侧棒的形成测量装置和棒通过从球到球的延长线插入,插入件可以与聚会形成联结,与房间结合,固定螺母环都是根据外包线在网格上的延伸标准,将其固定在外包一侧。弹簧显示刻度中的所有黄铜,以及聚会的所有隐藏状态,以及通过通孔插入管道的情况下,可以通过使用管线的下部来防止穿透来自垂直杆 uace0 uc815 ub418的螺钉,水平杆的左侧和右侧具有垂直杆组,而带有舰队的水平杆则具有螺钉,左侧垂直立杆位于垂直立杆顶部,与桥板一起,将下端固定在固定板上,并通过y型操作对 ud615 uc131 ub418安全性进行诊断。在安全诊断设备上配备了与河桥相同的套管部分;桥梁板的原始设计过时了安全诊断设备的安装,桥板的挠度和弯曲载荷的结构以及更精确的测量,以及以这为基础,可能对桥板的安全性产生影响。

著录项

  • 公开/公告号KR2004436920000Y1

    专利类型

  • 公开/公告日2009-03-11

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR2020090000419

  • 发明设计人 이길용;

    申请日2009-01-14

  • 分类号G01B5/30;G01B21/32;G01M1/00;

  • 国家 KR

  • 入库时间 2022-08-21 19:11:31

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号