The present invention relates to a method for forming a construction using a mounting hook in attaching and installing a downlight, which is a lighting fixture, in a buried form on a ceiling of a building. To this end, a circular downlight main body is formed, and a rectangular perforation of a predetermined size is formed on one side of a rectangular pillar formed to the left and right of the main body, and a "b" shaped fitting hole is formed to the left and right of the middle of the rectangular perforation. SUS material (tension) mounting hanger with semi-circular tension of a certain size is integrally formed on the joint part where the lower surface of the rectangular pillar formed to the left and right of the main body and the circular frame is connected and welded (spot). Tension) The hooking projection piece and the butterfly nut are attached to one side of the mounting hook. ; As described above, the downlight body is mounted on the ceiling, and it is a mounting hanger for easy and quick construction efficiently, thereby improving work efficiency and reducing costs due to time reduction, and preventing the mounting hanger from being carried separately during construction. The purpose is to help smooth construction by easy detachable. ; In this way, the downlight is embedded in the circular perforations formed on the ceiling tex, and the circumference of the ceiling tex is made by a SUS material (tension) mounting hook having a semicircular tension of a certain size attached to one side of the lower surface of the rectangular pillar formed on the left and right sides of the downlight body. By being caught by the left and right sides of the perforations, the support of the downlight mechanism main body is completed. ; Down light body, SUS material (tension) mounting hook, locking projection and butterfly nut, "b" self-fitting hole
展开▼