首页> 外国专利> METHOD OF INCREASING time between maintenance of downhole pumping equipment Mining WELL COMPLICATED scaling

METHOD OF INCREASING time between maintenance of downhole pumping equipment Mining WELL COMPLICATED scaling

机译:增加井下抽水设备维护间隔时间的方法采矿井井复杂水垢

摘要

FIELD: oil-and-gas production.;SUBSTANCE: according to method of bottom hole pumping equipment overhaul period increase in the production well complicated with scaling periodically perform preliminary cleaning out of oil film and asphalt resin paraffin of the mentioned above equipment - pumping of organic solvent into well, then removal of iron saline disposals from the equipment surface - pumping composition with % content: chlorohydric acid or acetic acid 25, corrosion inhibitor 18, scaling inhibitor 17, water 40, in to stopped well tubing annulus, overflush into pump and withstand it 1.5-2.0 hours, that mention above composition used in volume of 5.0-5.5% to well liquid volume from dynamic level to pump intake.;EFFECT: production well pumping equipment overhaul period increase.;1 ex
机译:领域:根据井下抽油设备的检修方法,在生产井中增加检修周期,并定期结垢,对上述设备的油膜和沥青树脂石蜡进行初步清洗-抽油将有机溶剂倒入井中,然后从设备表面去除铁盐沉淀物-泵送成分,其含量为%:氯氢酸或乙酸25,缓蚀剂18,阻垢剂17,水40,进入停止的油管环面,冲洗至泵中并能承受1.5-2.0小时,即上述成分的使用量为5.0-5.5%,从动态水平到泵进水量为井液量。;效果:生产井抽水设备大修周期增加; 1

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号