首页> 外文期刊>TEX Energy Report >No.4 & 5 CM to Start at Cook CollieryNo.4 continuous miner (CM) will shortly start a full-scale operation at Cook Colliery Bounty Mining Limited,Australia runs in the State of QLD.Furthermore, No.5 CM will be set up at Cook Colliery at the end of August. This CM is scheduled to startoperation on September 6. At the time when this CM starts to operate on a full scale, the production scale of raw cal atCook Colliery will increase to 1Mtpa.
【24h】

No.4 & 5 CM to Start at Cook CollieryNo.4 continuous miner (CM) will shortly start a full-scale operation at Cook Colliery Bounty Mining Limited,Australia runs in the State of QLD.Furthermore, No.5 CM will be set up at Cook Colliery at the end of August. This CM is scheduled to startoperation on September 6. At the time when this CM starts to operate on a full scale, the production scale of raw cal atCook Colliery will increase to 1Mtpa.

机译:在Cook Collieryno.4开始,澳大利亚康复矿业有限公司的连续矿工(CM),将在QLD状态下运行,澳洲连续矿工(CM)。 在8月底的厨师煤矿。 该厘米计划于9月6日开始启动。当此CM开始以满量程开始运行时,RAW CAL ATCOOK Colliery的生产规模将增加到1MTPA。

获取原文
获取原文并翻译 | 示例
       

著录项

  • 来源
    《TEX Energy Report》 |2018年第3654期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

  • 入库时间 2022-08-19 18:41:41

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号