首页> 外国专利> METHOD FOR CONSTRUCTION OF GROUP PILE FOUNDATION FOR BORING AND OPERATION OF WELLS IN OIL AND GAS DEPOSITS

METHOD FOR CONSTRUCTION OF GROUP PILE FOUNDATION FOR BORING AND OPERATION OF WELLS IN OIL AND GAS DEPOSITS

机译:油气藏井筒作业的群桩基础施工方法

摘要

FIELD: construction.;SUBSTANCE: invention is related to the field of construction, in particular, to technology for erection of pile foundations for plastic lower layers, and may be used in cluster drilling for development and operation of oil and gas deposits at highly silted area under severe climate conditions. Method for construction of group pile foundation for plastic lower layers and operation of oil and gas deposits wells in severe climate conditions includes preparation of pile cluster with installation of piles in it on rows with caps, fencing of pile cluster. To prepare pile cluster, surface earth is pressed and frozen at minus temperatures to arrange the layer that provides for safe motion of equipment with weight of more than 15 tons. Platform is organized, in which layout of axes is carried out to prepare seats for every pile and well. Base equipment is located, which consists of mobile and support technical facilities for installation of piles. Detachable cap is installed on one end of pile, in which snake line is fixed, other end of snake line is passed through bypass unit of support technical facility and fixed on mobile technical facility, opposite end of pile is installed in submersion seat, and by means of movement of mobile technical facility connected to support technical facility by means of snake line, pile is pushed in soil, afterwards base equipment is installed at the next planned seat and every further pile is located to provide for design pitch between piles and formation of longitudinal and transverse rows of wells relative to platform edge with creation of central piles row between them. Installation and submersion of piles is started from central row of platform edge. Upper parts of piles protruding above earth surface are rigidly fixed with fastening facilities. Then external side of pile cluster foundation is fenced with sheet metal along perimeter, in central part of which metal tray is made along the whole length of platform, piles used are pipes.;EFFECT: reduction of duration, cost and labour intensiveness of works performance, increased reliability and simplicity in well maintenance in process of operation, preservation of environment.;13 cl, 5 dwg
机译:技术领域本发明涉及建筑领域,尤其涉及用于塑料下层的桩基础的竖立技术,并且可用于集束钻探中以开发和操作高度粉尘的油气藏地区在恶劣的气候条件下。在恶劣的气候条件下,用于塑料下层的群桩基础的建造方法和油气储藏井的操作方法包括:准备桩簇,将桩安装在有盖的行中,将桩簇围起来。为了准备桩簇,将地面加压并在负温度下冻结,以布置可为重量超过15吨的设备提供安全运动的层。平台被组织起来,在其中进行轴的布置以为每个桩和井准备座位。定位了基础设备,该基础设备包括用于安装桩的移动和支持技术设施。可拆卸的帽盖安装在桩的一端,其中蛇形线固定,蛇形线的另一端穿过支撑技术设施的旁路单元并固定在移动技术设施上,桩的另一端安装在浸入式座椅中,并通过通过蛇形线连接到支持技术设施的移动技术设施的移动方式,将桩推入土壤中,然后将基础设备安装在下一个计划的座位上,然后再放置每一个桩,以提供桩之间的设计间距和井相对于平台边缘的纵向和横向排,并在它们之间形成中心桩排。桩的安装和浸入从平台边缘的中央排开始。突出于地面以上的桩的上部通过紧固装置牢固地固定。然后在桩群基础的外侧沿周长用金属板围起来,在平台的中央部分沿平台的整个长度制作金属托盘,所用的桩为管道。效果:减少工期,降低成本并减少劳动强度,提高了操作过程中井的维护的可靠性和简便性,保护了环境。; 13 cl,5 dwg

著录项

  • 公开/公告号RU2353727C1

    专利类型

  • 公开/公告日2009-04-27

    原文格式PDF

  • 申请/专利权人 GROT ALEKSANDR EHMANUILOVICH;

    申请/专利号RU20070133195

  • 发明设计人 GROT ALEKSANDR EHMANUILOVICH;

    申请日2007-09-04

  • 分类号E02B17/00;

  • 国家 RU

  • 入库时间 2022-08-21 19:10:34

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号