首页>
外国专利>
Roadway, tunnel and gallery blocking method for e.g. mine, involves filling breaking line with ballast, which is fixed ahead and behind sealing structure, and clamping sealing structure on both sides by ballast filling
Roadway, tunnel and gallery blocking method for e.g. mine, involves filling breaking line with ballast, which is fixed ahead and behind sealing structure, and clamping sealing structure on both sides by ballast filling
The method involves providing a high breaking line (5) in a form of a sealing structure ahead and behind a sealing element (4). The breaking line is filled with a ballast, which is fixed ahead and behind the sealing structure. The sealing structure is clamped on both the sides by the ballast filling, and a large diameter borehole (6) is guided into upper ends of the high breaking line. A conveyor device is installed in the large diameter borehole for the ballast filling.
展开▼