Method for remediating a solid ballast track constructed in e.g. railway station, involves forming filling openings along long side of threshold region before filling the filling material into cavity
Method for remediating a solid ballast track constructed in e.g. railway station, involves forming filling openings along long side of threshold region before filling the filling material into cavity
展开▼
机译:补救在例如火车站,涉及在将填充材料填充到型腔之前,沿着阈值区域的长边形成填充开口
展开▼
页面导航
摘要
著录项
相似文献
摘要
The method involves filling the filling material e.g. epoxy resin into cavity, below the threshold region (1) of solid ballast track. The filling openings (4) are formed along the threshold region before filling the filling material into cavity. The spacing between the filling openings at the long side of threshold region is 20cm. An independent claim is included for a solid ballast track.