首页>
外国专利>
Method for determination of rupture risk of aneurysm of patient, involves determining rupture risk at side of calculation device depending on specific person related factor for patients, and anatomy related factor is also related
Method for determination of rupture risk of aneurysm of patient, involves determining rupture risk at side of calculation device depending on specific person related factor for patients, and anatomy related factor is also related
The method involves determining rupture risk at the side of the calculation device depending on specific person related factor for the patients. An anatomy related factor is related to the anatomy or in the area of the aneurysm, and a simulation related factor is carried out. A simulation is carried out by other calculated devices and is based on anatomic data for the aneurysm. An independent claim is also included for a system for determination of a rupture risk of an aneurysm of a patient.
展开▼