首页>
外国专利>
Mounting for an electricity meter, in a building, takes two meters and data processing and/or transfer nits for conversion to electronic meters
Mounting for an electricity meter, in a building, takes two meters and data processing and/or transfer nits for conversion to electronic meters
展开▼
机译:将电表安装在建筑物中需要两个电表,并且需要进行数据处理和/或传输以转换为电子电表
展开▼
页面导航
摘要
著录项
相似文献
摘要
The mounting (1), for the installation of an electricity meter, has fastenings (2) to secure it at the cross (3) in the meter location (4). The under side carries openings matching the angled slits (28) and/or drillings (32) at the outer side (7), to take screw fasteners into the cross for at least two meters. A holding place (5) takes mountings and contacts and a holder (17) takes data processing and/or transfer units.
展开▼