首页> 外国专利> The construction management mannered null

The construction management mannered null

机译:施工管理人员为空

摘要

PROBLEM TO BE SOLVED: To provide a construction management method of a steel pile by a vibro-hammer capable of making the filling management of a flowable hardener by only making the operation of pile driving without being required for difficult flow adjustment of the flowable hardener.;SOLUTION: When the depth of the steel pile 1 is measured by a depth measuring instrument to transmit its result to a program to carry out foot protection construction of a pile front end section 10, time required for excavation by water injection and filling of the flowable hardener 11 is calculated by flow per unit time and estimated filling, the time is allotted to a vertical process and a fixed injection time so that it becomes homogeneous in each depth of foot protection, its result is input in the program operating on PC to make a graphic indication as a planned construction process when the coordinates taking the construction time to the axis of an abscissa and the depth to the axis of an ordinate is filled with the flowable hardener, and an operator is so operated that the graphic indication of the actual measured depth of the pile of the indication on the display by visibility can coincide with the graphic indication of the planned construction process to make it possible to fill the flowable hardener as a planned value.;COPYRIGHT: (C)2006,JPO&NCIPI
机译:解决的问题:提供一种通过振动锤进行的钢桩的施工管理方法,该方法能够通过仅进行打桩的操作而无需对流动性硬化剂进行困难的流量调节就能够进行流动性硬化剂的填充管理。 ;解决方案:当用深度测量仪测量钢桩1的深度并将其结果传输到执行桩前端部分10的脚部保护构造的程序时,通过注水和填土进行挖掘所需的时间可流动的硬化剂11是通过每单位时间的流量和估计的填充量来计算的,该时间被分配给垂直过程和固定的注射时间,以使其在每个护脚深度都变得均匀,其结果输入到PC上运行的程序中当坐标将施工时间设为横坐标轴且将深度设为纵坐标轴时,将图形表示为计划的施工过程填充可流动的硬化剂,并操作人员进行操作,以使显示器上可见的指示堆的实际测量深度的图形指示与计划的施工过程的图形指示重合,从而可以填充可流动的固化剂作为计划值。;版权所有:(C)2006,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号