首页> 外国专利> METHOD AND SYSTEM FOR CONSTRAINT-BASED PROJECT SCHEDULING

METHOD AND SYSTEM FOR CONSTRAINT-BASED PROJECT SCHEDULING

机译:基于约束的项目调度方法和系统

摘要

A method and system of constraint-based project scheduling. The method comprises maintaining a first database containing project scheduling data associated with at least a current period and a next period of an assignment plan; maintaining a second database containing data associated with a look ahead plan, the look ahead plan covering at least an overlap portion of the next period of the assignment plan such that the look ahead plan overlaps the assignment plan; transferring data associated with one or more shielded tasks having a starting time within the overlap portion of the next period from the second database into the first database as a modification of the project scheduling data associated with the next period of the assignment plan; and executing the project according to the next period of the assignment plan based on the modified project scheduling data associated with the next period in the first database.
机译:一种基于约束的项目调度方法和系统。该方法包括:维护第一数据库,该第一数据库包含与分配计划的至少当前周期和下一周期相关联的项目调度数据;以及维护第二数据库,该第二数据库包含与前瞻计划相关的数据,该前瞻计划至少覆盖分配计划下一个周期的重叠部分,以使前瞻计划与分配计划重叠;作为与分配计划的下一个周期相关联的项目调度数据的修改,将与下一个周期的重叠部分内具有开始时间的一个或多个屏蔽任务相关的数据从第二数据库传输到第一数据库;在第一数据库中,基于与下一时段关联的修改后的项目进度数据,根据分配计划的下一时段执行项目。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号