Scheduling Risk Evaluation for the Integrated Design of Blanket System Project for CFETR Based on Fuzzy PRET Method

机译:基于模糊预采样的CFETR橡皮布系统项目综合设计调度风险评估

获取原文
获取原文并翻译 | 示例
       

摘要

In the framework of the conceptual design and engineering design of the Chinese Fusion Engineering Testing Reactor, some preliminary investigation and estimation of the encountered risk factors in the integrated design process of blanket system were carried out. Sub-tasks of the entire project need to be decomposed before performing the integrated design of blanket system in order to perform a risk assessment for each task. To describe the key time of design process and predict the dates of tasks, a fuzzy PERT method is presented. The integrated design of blanket system project is divided into several tasks, which includes the optimistic time, pessimistic time and the most likely time of each task based on the experience of designer and analyst. The earliest start/finish time, latest start/finish time and slack time of each task is calculated by using the fuzzy PERT method. As a result, the critical path is found for scheduling assessment. The completing probability of the project under different requirements during the design period is calculated, which can provide valuable reference for the scheduling assessment of the integrated design of blanket system project.
机译:在中国融合工程检测反应堆概念设计和工程设计的框架中,进行了一些初步调查和估算了毯子系统综合设计过程中遇到的风险因素。在执行毯子系统的集成设计之前,需要对整个项目的子任务进行分解,以便为每项任务执行风险评估。为了描述设计过程的关键时间并预测任务日期,提出了一种模糊的Pert方法。毯子系统项目的集成设计分为几个任务,包括基于设计师和分析师的体验的每个任务的乐观时间,悲观时间和最可能的时间。通过使用模糊Pert方法计算最早的开始/完成时间,最新的开始/完成时间和每个任务的Slack时间。结果,找到了关键路径来调度评估。计算了在设计期间不同要求下项目的完成概率,可以为毯子系统项目的集成设计调度评估提供有价值的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号