首页> 外国专利> STEAM TURBINE TEST FACILITY, LOW-LOAD TEST METHOD, AND LOAD DUMP TEST METHOD

STEAM TURBINE TEST FACILITY, LOW-LOAD TEST METHOD, AND LOAD DUMP TEST METHOD

机译:汽轮机测试设备,低负荷测试方法和负荷转储测试方法

摘要

It is an object of the present invention to provide a steam turbine test facility including a test steam turbine, in which the behavior of an actual steam turbine can be precisely simulated and the efficiency of performance test can be improved. A steam turbine test facility 1 includes a test steam turbine 2 which simulates the behavior of a real steam turbines 11 included in the steam turbine plant 10, and a motor-generator 4 connected to the test steam turbine 2. A control unit 5 included in the motor-generator 4 controls the motor-generator 4 to change the rotational speed of the test steam turbine 2 based on an arbitrarily set speed change pattern. The speed change pattern is set such that the test steam turbine 2 in the load disconnection state simulates a time-profile of the rotational speed of the steam turbines 11 with the load disconnected.
机译:发明内容本发明的目的是提供一种包括测试蒸汽轮机的蒸汽轮机测试设备,其中可以精确地模拟实际蒸汽轮机的性能并且可以提高性能测试的效率。蒸汽轮机测试设施 1 包括一个测试蒸汽轮机 2 ,该模拟机模拟了蒸汽轮机工厂< B> 10 ,并将电动发电机 4 连接到测试蒸汽轮机 2 。电动发电机 4 中包含的控制单元<​​B> 5 控制电动发电机 4 以更改测试蒸汽轮机 2 基于任意设置的变速模式。设置变速模式,以使处于负载断开状态的测试蒸汽轮机 2 模拟断开负载后的蒸汽轮机 11 的转速的时间曲线。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号