首页> 外国专利> Estimating demand for a supply chain according to order lead time

Estimating demand for a supply chain according to order lead time

机译:根据订单提前期估算对供应链的需求

摘要

In one embodiment, estimating demand for a supply chain includes accessing a probability distribution for expected order lead time of the supply chain. The supply chain has nodes including a starting node and an ending node and a path from the starting node to the ending node. The probability distribution for expected order lead time describes ending node demand for the ending node versus order lead time. The path is divided into order lead time segments, and the order lead time segments are associated with the probability distribution for expected order lead time by associating each order lead home segment with a corresponding order lead time range of the probability distribution for expected order lead time. A demand percentage is estimated for each order lead time segment in accordance with the probability distribution for expected order lead time in order to estimate demand for the supply chain. Each demand percentage describes a percentage of a total ending node demand associated with the corresponding order lead time segment.
机译:在一个实施例中,估计对供应链的需求包括访问供应链的预期订单提前期的概率分布。供应链具有的节点包括起始节点和终止节点,以及从起始节点到终止节点的路径。预期订单提前期的概率分布描述了终止节点的需求与订购提前期的关系。路径被分为订单提前期段,并且通过将每个订单提前期首页段与预期订单提前期概率分布的相应订单提前期范围相关联,将订单提前期段与预期订单提前期的概率分布相关联。根据预期订单提前期的概率分布,为每个订单提前期段估计需求百分比,以便估算对供应链的需求。每个需求百分比描述了与相应订单提前期段关联的总结束节点需求的百分比。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号