A PROCESS FOR GENERATING A PROJECT WORKING BREAKDOWN STRUCTURE AND LIMITED WORK FLOWS

机译:生成项目工作分解结构和有限工作流的过程

摘要

The present invention provides a process and system for generating a project work breakdown structure (WBS) and related work flows, comprising the steps of selecting an existing project WBS, said existing project WBS having related work flows; selecting at least one desired outcome for synthesis, said at least one selected desired outcome having a first associated work flow comprising a network of interdependent activities; and synthesizing and first associated work flow with said existing project WBS and its related work flows by. (c 1 ) identifying the most downstream activity in said first associated work flow; (c 2 ) determinging whether each activity in said first associated work flow is already present in the project WBS and related work flows being generated by starring with the most downstream activity in said first associated work flow and working upstream until all activities in said first associate work flow have been compared to the activities of the project WBS and related work flows being generated; (c 3 ) adding any activity in said first associated work flow which is not already present in the project WBS and related work flows being generated; (c 4 ) adding activity dependencies which should exist between any of said added activities and any activity already present in the project WBS and related work flows being generated; and (c 5 ) introducing summary activities, when required, into the project WBS being generated when lowest-level activities from said first associated work flow are added.
机译:本发明提供了一种用于生成项目工作分解结构(WBS)和相关工作流程的过程和系统,包括选择现有项目WBS的步骤,所述现有项目WBS具有相关工作流程;选择用于合成的至少一个期望结果,所述至少一个选择的期望结果具有包括相互依赖的活动的网络的第一相关工作流程;并与所述现有项目WBS及其相关的工作流程合成并首先关联工作流程。 (c 1)识别所述第一相关工作流程中最下游的活动; (c 2)确定所述第一关联工作流程中的每个活动是否已经存在于项目WBS中,并且通过在所述第一关联工作流程中以最下游的活动为中心并向上游工作直到所述第一关联中的所有活动,来生成相关的工作流程。已将工作流程与项目WBS的活动以及正在生成的相关工作流程进行了比较; (c 3)在所述第一相关工作流程中添加项目WBS中尚不存在的任何活动,并生成相关工作流程; (c 4)增加活动依赖关系,该依赖关系应存在于任何所述增加的活动与项目WBS中已经存在的任何活动之间,并正在产生相关的工作流程; (c 5)当添加了来自所述第一相关工作流程的最低级别的活动时,在需要时将摘要活动引入正在生成的项目WBS中。

著录项

  • 公开/公告号IN2002KN01108A

    专利类型

  • 公开/公告日2009-11-13

    原文格式PDF

  • 申请/专利权人

    申请/专利号INPCT/2002/1108/KOL

  • 发明设计人 MAGEE TERENCE;YOUNG KEVIN W;

    申请日2002-08-28

  • 分类号G06Q10/00;

  • 国家 IN

  • 入库时间 2022-08-21 18:46:30

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号