首页>
外国专利>
METHOD OF MANAGING SCHEDULE MANAGEMENT BASED ON GEOGRAPHIC INFORMATION, PARTICULARLY FOR VISUALIZING DIVIDED SUBJECTS AND REGION ANALYSIS RESULTS FOR SCHEDULE STATISTICS
METHOD OF MANAGING SCHEDULE MANAGEMENT BASED ON GEOGRAPHIC INFORMATION, PARTICULARLY FOR VISUALIZING DIVIDED SUBJECTS AND REGION ANALYSIS RESULTS FOR SCHEDULE STATISTICS
PURPOSE: A method of managing schedule management based on geographic information is provided to maximize the efficiency in the management of a schedule by visualizing a statistic index through the analysis of the history for the created schedule.;CONSTITUTION: Schedule information is inputted according to the operation of a user, or the schedule information is transmitted from an external schedule server(S300). When a preset schedule check time comes, it is judged whether or not destination information is included in the schedule information(S302,S304). If so, the location information of a destination and the location information of the current terminal are obtained(S306). It is judged whether or not the terminal is placed within the preset distance range from the destination(S308). A notification message is outputted.;COPYRIGHT KIPO 2010
展开▼