BASEMENT INFRASTRUCTURE CONSTRUCTION METHOD USING A RECLAMATION STEEL PERIMETER BEAM AND A GIRDER
BASEMENT INFRASTRUCTURE CONSTRUCTION METHOD USING A RECLAMATION STEEL PERIMETER BEAM AND A GIRDER
展开▼
机译:围护结构钢梁和梁的地下室基础设施施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A basement infrastructure construction method using a reclamation steel perimeter beam and a girder is provided to improve the quality of produces by removing a joint.;CONSTITUTION: A basement infrastructure construction method using a reclamation steel perimeter beam and a girder are as follows. A retaining wall(100) is constructed. An interior column(110) is constructed inside the retaining wall. The retaining wall inner ground is blasted. A steel bracket(210) is established on the retaining wall. A buried steel wale(300) is established in a longitudinal direction of the retaining wall.;COPYRIGHT KIPO 2011