TWO-WAY SLAB USING A STEEL BEAM AND A CONSTRUCTION METHOD THEREOF, CAPABLE OF REDUCING CONSTRUCTION TIME AND CONSTRUCTION COSTS
TWO-WAY SLAB USING A STEEL BEAM AND A CONSTRUCTION METHOD THEREOF, CAPABLE OF REDUCING CONSTRUCTION TIME AND CONSTRUCTION COSTS
展开▼
机译:采用钢梁的双向平板及其施工方法,可减少施工时间和施工成本
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A two-way slab using a steel beam and a construction method thereof are provided to facilitate construction and reduce construction time as the construction is carried out by the two-way slab using a one-way half precast concrete.;CONSTITUTION: A two-way slab using a steel beam comprises a one-way half precast concrete(10), a steel beam, a lower distributing bar(20), a top reinforcing rod(40), an upper concrete layer, and a lightweight material. The one-way half precast concrete comprises a reinforcing rod for fixing the position. The main reinforcing rod is longitudinally disposed at fixed intervals. The reinforcing rod for fixing the position is disposed to meet at right angle to the main reinforcing rod. The end of one-way half precast concrete is put on the steel beam. The top reinforcing rod hangs on one-way half precast concrete.;COPYRIGHT KIPO 2010
展开▼