首页>
外国专利>
WELL SETUP FOR RESEARCH Garipova multilayer wells in dual completion
WELL SETUP FOR RESEARCH Garipova multilayer wells in dual completion
展开▼
机译:用于研究的井设置Garipova多层井双完成
展开▼
页面导航
摘要
著录项
相似文献
摘要
The invention relates to a downhole design, operation and investigation of multilayer deposits of hydrocarbons. To improve the accuracy of the location at a given depth of formation of instrumentation in the borehole and the reliability of the downhole installation, consisting of a pipe string, divided by packers on stage, at least one of which is provided with a control-measuring device with automatic remote control, connected to a conductive cable , a communication device comprises means defining a seat, with the possibility of installing it in the control meter and hydraulic kana Intended to be connected, if necessary, the pipe and / or annular spaces with a seat. 8 ZP f ly-5-yl.
展开▼
机译:本发明涉及烃的多层沉积物的井下设计,操作和研究。为了提高给定仪器深度在给定井眼中的位置精度,并提高井下安装的可靠性,该井下设备由管柱组成,并由台上的封隔器分隔,其中至少一个装有控制测量装置具有遥控功能的自动装置,连接到导电电缆,通信装置包括限定座的装置,可以将其安装在控制仪表和液压假名中,如果需要的话,与管和/或环形空间连接。座位。 8 ZP f ly-5-yl。
展开▼