Method for the stabilization of a dam or a stockpile on soft ground and a dam or stockpile produced by this method
Method for the stabilization of a dam or a stockpile on soft ground and a dam or stockpile produced by this method
展开▼
机译:在软土地基上稳定大坝或堆料的方法以及通过该方法生产的大坝或堆料的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for stabilizing a heaped dam or a heap in soft, yielding bottom (1). At the boundary of the planned pile (4) for the formation of the dam or of the stockpile at two opposite sides of the planned pile deeply into the bottom (1) driven rigid walls (5, 6) made of sheet piles or piles and erected at a level of the surface (3) of the soft base (1), high strength tension members (8), in particular cables, bundle, chains, bands, or high-strength synthetic geomaterial webs (78) parallel to one another on the soft base (1) and designed with the walls (5, 6) as far as possible, it is rigidly connected, if necessary, is between the rigid walls (5, 6) a on the surface (3) of the soft base (1) and the tensioning elements (8) resting on the webs of fabric (7) or plastic - films are arranged, which the soft base (1) of the pile (4) separately.
展开▼