首页> 外国专利> Method for the stabilization of a dam or a stockpile on soft ground and a dam or stockpile produced by this method

Method for the stabilization of a dam or a stockpile on soft ground and a dam or stockpile produced by this method

机译:在软土地基上稳定大坝或堆料的方法以及通过该方法生产的大坝或堆料的方法

摘要

A method for stabilizing a heaped dam or a heap in soft, yielding bottom (1). At the boundary of the planned pile (4) for the formation of the dam or of the stockpile at two opposite sides of the planned pile deeply into the bottom (1) driven rigid walls (5, 6) made of sheet piles or piles and erected at a level of the surface (3) of the soft base (1), high strength tension members (8), in particular cables, bundle, chains, bands, or high-strength synthetic geomaterial webs (78) parallel to one another on the soft base (1) and designed with the walls (5, 6) as far as possible, it is rigidly connected, if necessary, is between the rigid walls (5, 6) a on the surface (3) of the soft base (1) and the tensioning elements (8) resting on the webs of fabric (7) or plastic - films are arranged, which the soft base (1) of the pile (4) separately.
机译:一种稳定软堆积的水坝或堆的方法,可产生底部(1)。在计划桩(4)的边界处,用于在计划桩的两个相对侧形成大坝或堆垛,深深地钻入底部(1)由薄板桩或桩制成的从动刚性墙(5、6),高强度抗拉构件(8),特别是彼此平行的电缆,线束,链,带或高强度合成土工纤维网(78),竖立在软基底(1)的表面(3)的高度上在软底座(1)上并尽可能设计成具有壁(5、6),如果需要,它牢固地连接在软底座(3)上的刚性壁(5、6)之间布置有基部(1)和置于织物(7)或塑料薄膜上的张紧元件(8),它们分别由绒头(4)的软基部(1)构成。

著录项

  • 公开/公告号DE102009011119A1

    专利类型

  • 公开/公告日2010-09-16

    原文格式PDF

  • 申请/专利权人

    申请/专利号DE20091011119

  • 发明设计人

    申请日2009-03-03

  • 分类号E02D17/20;E02B3/12;

  • 国家 DE