首页> 外国专利> UNIT STRUCTURE OF ANCHOR BOLT USED FOR CONSTRUCTION OF FOUNDATION FOR EQUIPMENT, AND METHOD OF CONSTRUCTION OF FOUNDATION FOR EQUIPMENT USING THE UNIT STRUCTURE

UNIT STRUCTURE OF ANCHOR BOLT USED FOR CONSTRUCTION OF FOUNDATION FOR EQUIPMENT, AND METHOD OF CONSTRUCTION OF FOUNDATION FOR EQUIPMENT USING THE UNIT STRUCTURE

机译:用于设备基础的锚固螺栓的单元结构以及使用该单元结构的基础设施的建造方法

摘要

PROBLEM TO BE SOLVED: To reduce the construction period of a foundation base for installation of large equipment.;SOLUTION: Each of anchor bolts 1 inserted into a centering hole of a template 2 is temporarily fixed to a template 2 by a nut. The anchor bolts 1 are fastened to each other by an intermediate fastening support 3 by the intermediary of a fixing jig 4, and the verticality is adjusted. Then, detent welding 14 is applied between the template 2 and the nut. A shear plate 5 is fixed to the part near a lower end of each of the anchor bolts 1. Thus, the unit structure is manufactured in a factory. After a unit supporting frame 6 is set under a construction position of the foundation base 12 at an installation site, the unit structure transported from the factory is welded and fixed to the unit supporting frame 6 at the shear plate 5. After that, the detent welding 14 is shaved off, the template 2 is removed, a foundation base reinforcing bar 11 is arranged, and concrete is placed in the area of the foundation base 12.;COPYRIGHT: (C)2011,JPO&INPIT
机译:解决的问题:减少用于大型设备安装的基础基座的建造时间;解决方案:插入模板2的定心孔中的每个地脚螺栓1通过螺母临时固定到模板2上。借助于固定夹具4,通过中间紧固支撑件3将地脚螺栓1彼此紧固,并且调节垂直度。然后,在模板2和螺母之间进行定位焊接14。剪切板5固定在每个地脚螺栓1的下端附近的部分。因此,单元结构在工厂中制造。在将单元支撑框架6设置在基础基座12的安装位置的安装位置之后,将从工厂运送来的单元结构焊接并固定在剪切板5处的单元支撑框架6上。去除焊缝14,去除模板2,布置基础基座钢筋11,并在基础基座12的区域中放置混凝土。版权所有:(C)2011,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号