摘要

PPROBLEM TO BE SOLVED: To sufficiently reinforce an existing tunnel by using lightweight steel panels in a manner forming efficient cross sectional structure, without marring an internal surface of lining concrete. PSOLUTION: The plurality of steel panels 10 which are bent beforehand so as to conform to the shape of the internal surface of the lining concrete 30 of the existing tunnel, are carried in the construction field, and they are connected together in one body in a tunnel circumferential direction outside the tunnel, to thereby construct the almost arched steel panel assembly 22 (one unit) conforming to the shape of the internal surface of the lining concrete 30 of the existing tunnel. Then the steel panel assembly 22 (one unit) thus constructed is carried to a target place inside the tunnel, and set on fulcrum members 24, followed by connecting to the existing steel panel assembly 22 in a tunnel axial direction. Further a filler 26 such as mortar is filled in a space between the lining concrete 30 of the existing tunnel and the steel panel assembly 22, and thus a unitary body between the lining concrete 30 and the steel panel assembly 22 is constructed. PCOPYRIGHT: (C)2008,JPO&INPIT
机译:

要解决的问题:通过使用轻质钢板以形成有效的横截面结构的方式充分加固现有隧道,而不会损坏衬砌混凝土的内表面。

解决方案:在施工现场运送多个预先弯曲的钢板10以使其与现有隧道的衬砌混凝土30的内表面的形状一致,并将它们连接在一起在隧道外部沿隧道周向设置主体,从而构造出与现有隧道的衬砌混凝土30的内表面的形状相符的近似拱形的钢板组件22(一个单元)。然后,将如此构造的钢板组件22(一个单元)运送到隧道内的目标位置,并放置在支点构件24上,然后在隧道轴向上连接至现有的钢板组件22。另外,在现有隧道的衬砌混凝土30与钢板组件22之间的空间中填充诸如灰浆的填充剂26,从而在衬砌混凝土30与钢板组件22之间构成整体。

版权:(C)2008,日本特许厅&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号