首页> 外国专利> The concrete pier body body stand facilities

The concrete pier body body stand facilities

机译:混凝土墩身站台设施

摘要

PROBLEM TO BE SOLVED: To provide a seismic strengthening construction method for an existing concrete bridge pier, which dispenses with the deep excavation of soil around a bridge pier or the formation of a cut-off wall, which can shorten a construction period, and which makes construction costs lower.;SOLUTION: In this seismic strengthening construction method for the existing concrete bridge pier, a hole reaching stable ground is formed obliquely downward from the vicinity of the ground section of the existing concrete bridge pier or the outer peripheral section of the water-surface section thereof; a reinforcing member composed of a steel material, and a solidification material are infilled into the hole and solidified; and the other end of the reinforcing member is fixed to and integrated with the vicinity of the ground section of a bridge pier skeleton or the outer periphery of the water-surface section thereof.;COPYRIGHT: (C)2007,JPO&INPIT
机译:要解决的问题:为现有的混凝土桥墩提供一种抗震的施工方法,省去了桥墩周围的土层的深挖工作或形成了防渗墙,从而缩短了工期,并且解决方案:在现有混凝土桥梁墩的这种抗震加固方法中,从现有混凝土桥梁墩的地面部分附近或隧道外围部分的斜下方形成一个通向稳定地面的孔。其水面部分;将由钢材构成的加强构件和凝固材料填充到孔中并凝固。加强件的另一端固定在桥墩骨架的地面部分附近或其水面部分的外围并与之形成一体。;版权所有:(C)2007,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号