A method of fracking multiple laterals sequentially is described. It allows the drilling rig to be moved off site as the laterals are fracked. Thereafter, they can all be produced simultaneously. The laterals begin from a main lateral that is already oriented in the producing zone and preferably exit in a coplanar manner so as to extend immediately into the producing formation.
展开▼