首页> 外国专利> PRESTRESSING BRIDGE USING THE RIFLING BEAM AND METHODE FOR INSTALLATION THEREOF

PRESTRESSING BRIDGE USING THE RIFLING BEAM AND METHODE FOR INSTALLATION THEREOF

机译:使用横梁预应力桥梁及其安装方法

摘要

PURPOSE: A prestressing bridge, using a steel wire rod buried beam, and an installation method thereof are provided to improve workability and safety by omitting a separate prepressing process after bridge construction is completed. CONSTITUTION: A prestressing bridge, using a steel wire rod buried beam, comprises a bridge post, multiple beams, and a surface part. The bridge post is with a constant interval installed in the location in which the prestressing bridge is installed. A fixing part(102) is installed on the upper part of the bridge post. The both ends of multiple bride posts are fixed to the fixing unit. The steel wire, in which a pre-stress is applied, is integrally buried on the surface of multiple bride posts. The surface part is installed in the upper side of each steel wire rod buried beam.
机译:目的:提供一种使用钢丝绳埋入梁的预应力桥梁及其安装方法,通过在桥梁建造完成后省略单独的预压过程来提高可使用性和安全性。组成:预应力桥梁,使用钢丝杆埋入的梁,包括桥柱,多根梁和一个表面部分。桥梁桩在安装预应力桥梁的位置以固定间隔安装。固定部件(102)安装在桥柱的上部。多个新娘柱的两端被固定到固定单元。施加了预应力的钢丝被整体埋在多个新娘柱的表面上。该表面部分安装在每个钢丝埋入梁的上侧。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号