FIELD: construction.;SUBSTANCE: method includes construction of a new reinforced concrete dam with a spillway, premises for hydraulic units, a fish hoist that is reliably blocked with a new cellular earth dam, and also with devices to let vessels through between upper and lower reaches. Construction is carried out in a pit that is protected against surface drains and ground waters and is dug in dry area. Soils taken from the pit are used to strengthen the existing earth dam. A temporary channel is built designed to divert water from the new dam to the existing spillway of the Krasnodar water-engineering system. Transport streams are changed over to the new dam. Further the bed of a permanent drainage canal is built from a new spillway from Krasnodar reservoir to the Kuban river valley downstream the place where the existing dam of the Krasnodar water-engineering system is placed. Afterwards water is drained from the water area between the new dam and the existing dam of the Krasnodar water-engineering system, and the water area is filled with soil.;EFFECT: more efficient prevention of areas flooding without interruption in operation of all existing facilities.;3 cl
机译:技术领域:方法:方法包括建造带有溢洪道的新型钢筋混凝土大坝,液压装置房屋,由新型蜂窝式土坝可靠地阻塞的鱼卷机,以及使船只通过上层和下层之间的装置下游。施工应在防止地表排水和地下水的坑中进行,并在干燥的地方挖。从坑中获取的土壤用于加固现有的土坝。修建了一条临时通道,旨在将水从新大坝引到克拉斯诺达尔水工程系统的现有溢洪道。运输流被转换到新的水坝。此外,从克拉斯诺达尔水库到位于克拉斯诺达尔水工程系统现有大坝下游的库班河谷的新溢洪道修建了永久排水渠的河床。之后从克拉斯诺达尔水利工程系统的新水坝和现有水坝之间的水域中抽水,水域充满土壤。效果:更有效地防止洪水泛滥,而不会中断所有现有设施的运行。; 3厘升

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号