首页> 外国专利> Method for stabilizing terrain for building site, involves fixing set of anchoring rods in corresponding orifices, and fixing set of reinforced concrete spalls on anchoring rods, and filling drainage space with drainage material

Method for stabilizing terrain for building site, involves fixing set of anchoring rods in corresponding orifices, and fixing set of reinforced concrete spalls on anchoring rods, and filling drainage space with drainage material

机译:一种稳定建筑工地地形的方法,包括将一组锚固杆固定在相应的孔中,并将一组钢筋混凝土剥落固定在锚固杆上,并用排水材料填充排水空间

摘要

The method involves fixing a set of anchoring rods (12) in corresponding orifices (20) arranged in predetermined locations of a terrain (11) to be stabilized, where each opening comprises a length for providing resistance to erosion for each anchoring rod. A set of reinforced concrete spalls (13) is fixed on the anchoring rods, where each spall is traversed by the anchoring rods and spaced from the terrain to create a drainage space (15) between the terrain and the spalls. The drainage space is filled with a drainage material (17). An independent claim is also included for a terrain stabilizing structure comprising a set of anchor rods.
机译:该方法包括将一组锚杆(12)固定在布置在要稳定的地形(11)的预定位置中的相应孔口(20)中,其中每个开口包括用于为每个锚杆提供抗腐蚀的长度。一组钢筋混凝土剥落物(13)固定在锚杆上,其中每个剥落物都通过锚固杆横越并与地形间隔开,以在地形和剥落物之间形成排水空间(15)。排水空间填充有排水材料(17)。还包括具有一组锚杆的地形稳定结构的独立权利要求。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号